Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Decommissioning›Hybrid-battery-powered vessel backs DeepOcean on UK decommissioning gig
Decommissioning

October 3, 2023 · about 3 years ago

Hybrid-battery-powered vessel backs DeepOcean on UK decommissioning gig

Subsea services provider DeepOcean has completed a decommissioning project on a Fairfield Energy platform located on the UK continental shelf, with work conducted from a hybrid-battery-powered construction support vessel (CSV). As part of its scope, DeepOcean removed six subsea conductors and four v

2 minutes read
  • LinkedIn
  • X
  • Email
Hybrid-battery-powered vessel backs DeepOcean on UK decommissioning gig
Source: DeepOcean

Subsea services provider DeepOcean has completed a decommissioning project on a Fairfield Energy platform located on the UK continental shelf, with work conducted from a hybrid-battery-powered construction support vessel (CSV).

As part of its scope, DeepOcean removed six subsea conductors and four vertical supports at varying water depths and removed the upper conductor guide frames with an estimated weight of 400 tonnes, together with the design and installation of bespoke clamps, on the Dunlin Alpha platform.

The company’s Aberdeen office was responsible for engineering and project management, with support from the Haugesund and Stavanger offices in Norway. Offshore work was conducted from the hybrid-battery-powered CSV Edda Freya .

Subcontractors Claxton, Machtech and Global Energy Group assisted in delivering the scope of work.

According to DeepOcean, the entire project was completed within 12-16 weeks from contract award to offshore execution.

“The project required intensive dynamic and structural analysis to enable the removal of the upper conductor guideframes. The scope also required significant shallow water ROV operations for the removal of the upper guideframe and conductors,” said Gary Scott , UK Commercial Manager and Legal Counsel at DeepOcean.

“With high-end subsea engineering involved, together with specialist subsea tools and technologies required to execute the project, coupled with our attention to high quality and safe project delivery, I would classify it as a flagship project for DeepOcean.”

The Dunlin Alpha installation, located approximately 137 kilometers northeast of Shetland and in a water depth of 151 meters, produced its first oil in 1978.

In the 37 years that followed, more than 522 MMbbl of oil was recovered from the Greater Dunlin Area, comprising the Dunlin, Dunlin S/W, Osprey and Merlin fields.

Fairfield Energy acquired the assets in 2008 and took over full operatorship in 2014, maximizing production during its late-life stage and then progressing its subsequent decommissioning programs.

SUBSCRIBE

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DecommissioningFossil EnergySubseaSurveys & InterventionsBusiness & FinanceBusiness Developments & ProjectsInfrastructureProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free