Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›New milestone for Cyprus LNG terminal as FSRU wraps up sea trials
Business Developments & Projects

November 17, 2023 · about 2 years ago

New milestone for Cyprus LNG terminal as FSRU wraps up sea trials

Floating storage and regasification unit (FSRU) Prometheus, built by China Petroleum Pipeline-led consortium for the Cyprus LNG terminal project, has completed modified gas mode sea trials as the terminal launch is anticipated in July 2024. Conversion of the Prometheus from ETYFA’s LNG carrier to an

2 minutes read
  • LinkedIn
  • X
  • Email
New milestone for Cyprus LNG terminal as FSRU wraps up sea trials

Floating storage and regasification unit (FSRU) Prometheus, built by China Petroleum Pipeline-led consortium for the Cyprus LNG terminal project, has completed modified gas mode sea trials as the terminal launch is anticipated in July 2024.

Conversion of the Prometheus from ETYFA’s LNG carrier to an FSRU was completed in China earlier this year. The first sea trials took place on July 23, 2023.

The consortium responsible for the conversion has now revealed that the FSRU completed modified gas mode sea trials on October 27. The trial was conducted over a period of twelve days, covering 2,200 nautical miles and meeting all design requirements.

This content is available after accepting the cookies.

?The #Cyprus #LNG terminal project "Prometheus" achieved a milestone as the FSRU completed a modified gas mode sea trial on Oct 27. Jointly built bythe #CNPC CPP and @COSCOSHIPPING , the 12-day trial covered 2,200 nautical miles, with all test data meeting design requirements.? pic.twitter.com/d8o7p5M95r

The FSRU will be a part of the LNG terminal at Vassiliko Port in Cyprus. The consortium comprising China Petroleum Pipeline, Wilhelmsen Ship Management, Aktor S.A., Metron S.A., and Hudong-Zhonghua Shipbuilding, was selected to build the LNG import terminal that includes FSRU, a jetty for the mooring of the FSRU, jetty borne and onshore pipelines as well as additional facilities.

The €300 million project, which is co-financed by a grant of 40%, or up to €101 million from the European Union’s Connecting Europe Facility (CEF) financing instrument, was initially scheduled for completion in 2021.

According to media reports, a new delivery timeline has been scheduled for July 23, 2024, which marks the fourth consecutive schedule adjustment and the third revised schedule submitted.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago