Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Wagenborg: Third EasyMax vessel reaches Delfzijl
Infrastructure

January 11, 2024 · about 2 years ago

Wagenborg: Third EasyMax vessel reaches Delfzijl

Dutch shipowner and operator Royal Wagenborg revealed that its third EasyMax-type multipurpose ship has salt water under the keel for the first time after being transported from Royal Niestern Sander shipyard to its home port of Delfzijl.

2 minutes read
  • LinkedIn
  • X
  • Email
Wagenborg

Dutch shipowner and operator Royal Wagenborg revealed that its third EasyMax-type multipurpose ship has salt water under the keel for the first time after being transported from Royal Niestern Sander shipyard to its home port of Delfzijl.

The newbuilding, Amalia, was transferred to Delfzijl on January 4, 2024.

The EasyMax 3 was launched at the Farmsum-based shipyard in October 2023. The vessel now awaits its sea trials. It is expected to be delivered to Wagenborg and its affiliated partners by the end of this month, after which the newbuild will start its maiden voyage.

With a load capacity of 14,200 tonnes and a hold volume of more than 625,000 cft, the EasyMax is the biggest ship type ever built in the north of the Netherlands. With a length of 149.95 meters, a beam of 15.90 meters and a draught of 8.60 meters, the EasyMax has the maximum possible dimensions for the Royal Niestern Sander shipyard.

The combination of the main engine, gearbox, propeller, and thruster means that the EasyMax has an energy-efficient propulsion system, leading to extremely low fuel consumption.

The hull shape has also been optimized for various draughts, resulting in an ultra-low Energy Efficiency Design Index (EEDI).

With two large box-shaped holds, ice-classed 1A multi-purpose vessels excel in their class with their very high capacity for heavy or light cargo, timber and paper, according to the company.

Last month, Wagenborg, which has a fleet of about 170 vessels, ordered its fifth EasyMax vessel at Royal Niestern Sander. With the delivery of the third Easymax approaching and the construction of the fourth unit being in full swing, the repeat order is said to fit perfectly into the production process at the yard.

This sister ship of the MV Egbert Wagenborg and MV Máxima — the first two units from the batch — is expected to be delivered by the end of 2025.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

18 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

18 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago