Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Tsuneishi Shipbuilding hands over its first LPG carrier
Infrastructure

January 31, 2024 · about 2 years ago

Tsuneishi Shipbuilding hands over its first LPG carrier

Japanese shipbuilder Tsuneishi Shipbuilding has completed the delivery of its first liquefied petroleum gas (LPG) carrier.

1 minutes read
  • LinkedIn
  • X
  • Email
Tsuneishi

Japanese shipbuilder Tsuneishi Shipbuilding has completed the delivery of its first liquefied petroleum gas (LPG) carrier.

The newbuilding was delivered to an undisclosed owner on January 31, 2024.

The LPG tanks were entirely manufactured in-house, and molding the tank head to the edge of the pressure tank was a significant challenge. Nevertheless, this task was successfully carried out using existing equipment, according to Tsuneishi.

The LPG carrier installed with these tanks will retain the main dimensions of the standard 5,000 cbm LPG carrier class. The vessel has a cargo tank capacity of 5,000 cbm, a length of 99 meters, a breadth of 17.6 meters, and a depth of 8 meters.

Mitsui E&S Shipbuilding of the Tsuneishi Group provided the expertise of tank manufacturing and gas outfitting, such as the basic design, the detailed design for the gas tank and gas system, the assembly procedure, and the precision management method.

As explained, the LPG carrier features a hull form that reduces propulsion resistance and the newest main engine technology to comply with the CO2 emission regulations of EEDI Phase 3 . Equipped with selective catalytic reduction (SCR), this LPG carrier qualifies as an eco-ship with advanced propulsion and environmental performance that satisfies the requirements of the NOx Tier III regulations.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

18 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

18 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago