Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›NYK orders 174,000 cbm LNG carrier for JERA charter
Infrastructure

February 7, 2024 · about 2 years ago

NYK orders 174,000 cbm LNG carrier for JERA charter

On January 31, Japanese shipping company NYK and compatriot power generation company JERA signed a long-term charter contract for a new liquefied natural gas (LNG) carrier to be built in South Korea by Hyundai Samho Heavy Industries.

1 minutes read
  • LinkedIn
  • X
  • Email
NYK

On January 31, Japanese shipping company NYK and compatriot power generation company JERA signed a long-term charter contract for a new liquefied natural gas (LNG) carrier to be built in South Korea by Hyundai Samho Heavy Industries.

The 289.9-meter-long vessel will be delivered in 2027 and will be used to transport LNG for JERA.

As explained, the contract will contribute to the stable supply of LNG in partnership with JERA and strengthen and promote NYK’s LNG business as a core business of the company.

Specifically, the vessel will be equipped with a next-generation X-DF2.2 iCER dual-fuel, low-speed diesel engine that uses fuel oil and boil-off gas for the main engine and a re-liquefaction system that can use surplus boil-off gas effectively.

The vessel will have a 174,000 cubic meter capacity membrane-type tank that uses advanced insulating materials to realize superior efficiency and economical LNG transportation, according to the company.

The vessel is the 11th LNG carrier NYK has chartered under a time charter contract with JERA. In its medium-term management plan announced in March 2023, NYK positioned its bulk shipping business as a core business and will invest JPY 300 billion (about $2.03 billion) in LNG carrier construction by fiscal 2026.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

18 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

18 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago