Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Allseas to take Pioneering Spirit to huge North Sea field in 2026
Business & Finance

June 13, 2024 · about 2 years ago

Allseas to take Pioneering Spirit to huge North Sea field in 2026

Allseas has secured a contract with Norwegian state-owned Equinor to perform the installation of pipeline and integrated structures at a huge oil and natural gas field in the Norwegian sector of the North Sea. Under the contract, Allseas will install the pipeline and integrated structures for the se

2 minutes read
  • LinkedIn
  • X
  • Email
Allseas to take Pioneering Spirit to huge North Sea field in 2026

Allseas has secured a contract with Norwegian state-owned Equinor to perform the installation of pipeline and integrated structures at a huge oil and natural gas field in the Norwegian sector of the North Sea.

Under the contract, Allseas will install the pipeline and integrated structures for the second development stage of the Troll Phase 3 project, set to accelerate the production and contribute to maintaining the high production capacity utilization of Troll A Platform and Kollsnes onshore plant towards 2030.

The award includes the fabrication and assembly of multiple pipeline heads and the inline tees, installation, and retrieval of counteracts, and flooding, cleaning and gauging of the pipeline system. Execution is planned with Pioneering Spirit in 2026.

This third phase will enable gas production from the Troll West field via subsea tiebacks to the original Troll A platform, approximately 80 kilometers northwest of Bergen, Norway.

For Stage 2, Allseas will install a 28-kilometer, 36-inch concrete-weight-coated gas line parallel to the Stage 1 pipeline, installed by the Solitaire pipelay vessel in 2020. The new pipeline will contain three inline tees, one for future tie-in flexibility.

Equinor is planning the development and production of the Troll field in three phases, stating that this is because of vast resources. Phase 1 entailed the gas resources in Troll East, which resulted in the Troll A platform, the Kollsnes gas plant, and associated infrastructure. This gas is exported to Europe via the Zeepipe pipelines.

The oil from Phase 2, which covered resources in Troll West, leading to the Troll B and C platforms and associated infrastructure, is sent to the oil terminal at Mongstad. The first part of Phase 3 involved producing the gas cap overlying the oil column in Troll West, while continuing to produce oil. The produced gas goes to Troll A and onward to existing infrastructure.

This is now being expanded further as Equinor and partners decided to invest just over NOK 12 billion (close to $1.13 billion) to boost the gas infrastructure in the Troll West gas area in a bid to accelerate production from the reservoir.

Related Article

SLB, Subsea7, and Aker Solutions’ JV finds work on $1 billion North Sea gas project

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsInfrastructureProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago