Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Seaspan’s third 7,600 cbm LNG bunkering vessel hits the water
Business Developments & Projects

July 4, 2024 · about 2 years ago

Seaspan’s third 7,600 cbm LNG bunkering vessel hits the water

The third and final 7,600 cbm LNG bunkering vessel ordered by Seaspan at CIMC Sinopacific Offshore & Engineering (CIMC SOE) has been launched.

2 minutes read
  • LinkedIn
  • X
  • Email
Seaspan’s third 7,600 cbm LNG bunkering vessel hits the water

The third and final 7,600 cubic meter (cbm) LNG bunkering vessel ordered by Canadian shipowner Seaspan at China’s CIMC Sinopacific Offshore & Engineering (CIMC SOE) has been launched.

The launching ceremony for the 112.8-meter-long vessel Seaspan Baker was held on July 1st.

The first two vessels, Seaspan Garibaldi and Seaspan Lions , were launched in January and April this year, respectively. They are scheduled for delivery in 2024 while Seaspan Baker will arrive in 2025.

Seaspan Baker is currently targeted to service the Long Beach container ship market and will join the Seaspan Lions in providing LNG fueling services for vessels on the West Coast of North America. Seaspan Garibaldi is set to deliver low-carbon solutions to the global market and will be based in the Panama region.

To remind, CIMC SOE signed an agreement with Seaspan for the construction of two 7,600 cbm LNG bunker vessels, with the option for a third vessel, in May 2023.

To design these vessels, Seaspan teamed up with VARD Marine Inc. to incorporate emerging technologies resulting in a decrease in emissions and underwater noise.

The design is focused on safe, efficient, and economical refueling of multiple ship types with an ability to transfer to and from a wide range of terminals, allowing the vessel to engage in ship-to-ship LNG transfer along with coastal and short-sea shipping cargo operations.

All three vessels will measure 112.8 meters in length, 18.6 meters in width, and 5 meters in draft, with a design speed of 13 knots.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsGreen MarineInfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

13 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

13 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago