Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Yinson GreenTech and WSS to set up charging infrastructure for Singapore’s first all-electric cargo ship
Business Developments & Projects

October 17, 2024 · about 1 year ago

Yinson GreenTech and WSS to set up charging infrastructure for Singapore’s first all-electric cargo ship

Green technology solutions provider Yinson GreenTech (YGT) and maritime services provider Wilhelmsen Ships Service (WSS) have signed an agreement to build a charging infrastructure for Singapore’s first fully electric cargo vessel, Hydromover. As disclosed, the charging infrastructure for the 18.5-m

2 minutes read
  • LinkedIn
  • X
  • Email
Yinson GreenTech and WSS to set up charging infrastructure for Singapore’s first all-electric cargo ship

Green technology solutions provider Yinson GreenTech (YGT) and maritime services provider Wilhelmsen Ships Service (WSS) have signed an agreement to build a charging infrastructure for Singapore’s first fully electric cargo vessel, Hydromover.

As disclosed, the charging infrastructure for the 18.5-meter vessel equipped with swappable batteries and the capacity to transport up to 25 tonnes of cargo will be established at WSS’ Pandan Loop facility.

Building the charging infrastructure is seen as a “significant step” in ongoing efforts to develop electrification solutions for harbor craft, aligning with the Maritime and Port Authority of Singapore (MPA) and Singapore Maritime Institute (SMI) initiatives.

To note, MPA is mandating all harbor craft to become fully electric, be capable of using B100 biofuels, or be compatible with net zero fuels such as hydrogen by 2030.

The latest agreement builds on a previous collaboration between Yinson and WSS in which WSS became the first company to have its cargo moved by Hydromover during the ship’s commercial trials.

This electric cargo transfer was facilitated by OPL Services, the first harbor craft operator to trial Hydromover, and included moving the cargo from the Wilhelmsen Ships Service jetty at Pandan Loop to the receiving vessel M/V Wadi Almalekat at the Eastern Anchorage AEBB area.

YGT’s marine electrification business marinEV announced the start of commercial trials for Hydromover on September 6, 2024, saying it will allow harbor craft operators to trial a fully electric lighter craft as part of their existing fleet and experience the operational benefits of the innovative technology first-hand.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsCollaborationGreen MarineInfrastructureOutlook & StrategyVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

13 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

13 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

13 days ago