Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›EPS expands fleet with new 7,000 CEU dual-fuel PCTC
Business Developments & Projects

March 26, 2025 · about 1 year ago

EPS expands fleet with new 7,000 CEU dual-fuel PCTC

Singaporean shipowner Eastern Pacific Shipping (EPS) has taken delivery of Lake Travis, the fifth 7,000 CEU dual-fuel pure car and truck carrier (PCTC) built by China Merchants Jinling Shipyard (Weihai).

2 minutes read
  • LinkedIn
  • X
  • Email
EPS expands fleet with new 7,000 CEU dual-fuel PCTC

Singaporean shipowner Eastern Pacific Shipping (EPS) has taken delivery of Lake Travis, the fifth 7,000 CEU dual-fuel pure car and truck carrier (PCTC) built by China Merchants Jinling Shipyard (Weihai).

According to the Chinese shipbuilder, the latest addition to EPS’ fleet was delivered on March 24, 2025, ahead of schedule.

Like its sister vessels, Lake Travis has a length of 199.9 meters, a molded breadth of 38 meters, a designed draft of 8.6 meters, a gross tonnage of 72,000, a designed speed of 19.5 knots, and 12 cargo decks in total.

The PCTC features a high-pressure dual-fuel engine and two sets of 2,000 cubic meter (cbm) LNG storage tanks, with a hybrid propulsion system provided by Finnish technology group Wärtsilä.

The vessel was designed to meet IMO TIER III emissions standards and is capable of reducing SOx, NOx, particulate matter, and CO2 emissions by using dual-fuel hybrid power.

Lake Travis is a part of EPS’ 4+2 shipbuilding order placed in 2022 at China Merchants Jinling Shipyard (Weihai).

The first unit from this batch, Lake Herman , was delivered in 2023. Delivery of the sixth vessel, Lake Victoria, is anticipated in June 2025.

Related Article

EPS’ sixth dual-fuel PCTC launched at Jinling Shipyard

EPS has additional LNG dual-fuel PCTCs on order at two Chinese shipyards , namely at Fujian Mawei Shipbuilding and China Merchants Heavy Industry (CMHI) Jinling.

The order at Fujian Mawei Shipbuilding encompasses four 5,500 CEU PCTCs, with delivery scheduled for 2027.

The remaining two LNG dual-fuel PCTCs ordered at CMHI Jinling are expected to be delivered in 2028.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsGreen MarineInfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago