Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Chinese shipyard starts building next Avenir LNG bunkering vessel
Business Developments & Projects

July 29, 2025 · about 1 year ago

Chinese shipyard starts building next Avenir LNG bunkering vessel

China’s Nantong CIMC Sinopacific Offshore & Engineering (SOE) has started constructing the next 20,000 cubic meter (cbm) LNG bunkering vessel for UK-based midstream LNG & BioLNG company Avenir LNG.

1 minutes read
  • LinkedIn
  • X
  • Email
Chinese shipyard starts building next Avenir LNG bunkering vessel

China’s Nantong CIMC Sinopacific Offshore & Engineering (SOE) has started constructing the next 20,000 cubic meter (cbm) LNG bunkering vessel for UK-based midstream LNG & BioLNG company Avenir LNG.

The construction began with the steel cutting ceremony held on July 21, Avenir LNG revealed in a social media update.

Scheduled for delivery at the end of 2026, the LNG bunkering vessel (hull S1123) is the first of two units to be built at the Chinese shipyard and chartered by Vitol International Shipping, a shipping company of energy and commodities group Vitol.

The second vessel is scheduled to enter construction later this year, with delivery expected in early 2027.

Related Article

Avenir LNG orders two 20,000 cbm LNG bunker and supply vessels in China

As previously reported, the bunkering vessels will have a length of 160 meters, a width of 25 meters, and a design speed of 15.5 knots.

The ships will feature new Type C tank designs, lower boil-off rates, the latest engine technologies, hull form optimization, and subcoolers, which offer carbon emission reductions and minimize cargo losses compared to other vessels of this size.

According to Avenir LNG, the design enables maximum compatibility and versatility for loading and discharging LNG and BioLNG to a wide range of receiving vessels and terminals.

The ships were ordered as the second phase of the company’s growth strategy, increasing the fleet by 40% and 80% in terms of total capacity.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago