
The International Maritime Organisation (IMO) Council has decided to establish an International Day for Women in Maritime, to be observed on 18 May every year.

As the final day of the COP26 conference is approaching, the pressure to end the era of fossil fuels is mounting and all eyes are on Glasgow.

Dutch offshore floating solar specialist Oceans of Energy has announced the upscaling of the world’s first offshore solar farm system for 20 times to 1MW in capacity.

The regulator has launched an investigation following findings of corrosion on Equinor-operated Troll C platform’s gas compressor coolers.

A Just Transition Maritime Task Force has been formed at COP26 to drive decarbonisation of the industry and support millions of seafarers through shipping’s green transition.

A survey of over 100 UK members of parliament (MPs) for the British Ports Association has revealed a tentative consensus for a joint model of funding for shore power in ports.

The Electricity Generating Authority of Thailand (EGAT), a state-owned enterprise, has put the 45MW hydro-floating solar hybrid – deemed as the world’s largest – into commercial operation at Sirindhorn Dam.

Nineteen countries have signed a declaration to establish “green shipping corridors” — zero-emission maritime routes between two or more ports — in an effort to help the shipping sector decarbonize.

Scottish tidal energy companies Nova Innovation and SIMEC Atlantis Energy have entered into collaboration agreement with the goal of delivering more UK-built tidal turbines in the water, turbo charging the tidal industry.

22 Governments and the European Commission, collaborating through Mission Innovation, have announced four missions to catalyse investment and action to make the clean energy technologies that will decarbonise the most challenging sectors.

Aker BP has concluded the drilling of a wildcat well in the North Sea and encountered a minor oil discovery, which is not commercial.

Shipping is the critical enabler in the world’s transition to low carbon operations and needs government support to ensure it is at the front of the queue for next-generation fuels, ABS Chairman and CEO Christopher J. Wiernicki told delegates at COP26.

Ørsted is proposing to build a large-scale offshore wind project in Vietnam which would have an installed capacity well beyond the offshore wind farms currently under construction or in development and would require an investment of over €10 billion. The developer has introduced its plan to a local

Ofgem has given the green light for preparing the Final Needs Case stage of the regulatory approvals process for the East Coast subsea HVDC link that will connect Scotland and England.