
Vestas has commissioned its first-ever intertidal wind turbine at Bac Phuong JSC’s wind farm in Vietnam. Last year, Vestas won a contract to supply 13 V150-4.2 MW turbines for the second phase of Bac Phuong JSC’s Dong Hai 1 intertidal wind project. The order follows the company’s first contract with

A team of engineering researchers from two UK universities have conducted a study which showed that arranging tidal turbines in a close formation, as opposed to wider spacing, results in an increased power capture.

Malaysia’s oilfield services provider Icon Offshore has won a contract award for the provision of a jack-up rig to Petrofac in Malaysia.

A new joint industry project has been launched under the Carbon Trust’s Offshore Wind Accelerator to improve understanding of the true impact of the Global Blockage Effect (GBE) in offshore wind by undertaking a first of a kind measurement campaign in real offshore conditions. The campaign will be c

The Norwegian Petroleum Directorate (NPD) has granted Neptune Energy a drilling permit for an appraisal well offshore Norway.

Denmark has reached a landmark agreement on the construction of an energy hub in the North Sea. The energy hub will be an artificially constructed island 80 kilometers from the shore of the peninsula Jutland. Around 200 wind turbines with a combined capacity of 3 GW are expected to be installed in t

Norwegian offshore vessel owner Solstad Offshore has decided to sell three of its platform supply vessels (PSVs).

The National Renewable Energy Laboratory (NREL) has added marine energy to the open-source System Advisor Model (SAM) toolkit to facilitate the cost and performance analysis for wave and tidal energy systems.

TEPCO Renewable Power (TEPCO RP) has joined the TetraSpar floating foundation demonstration project by buying a 30% stake. In addition to TEPCO RP, the share structure in the project includes Shell holding a 46.2% share, RWE 23.1% and Stiesdal Offshore Technologies 0.7%. Through their collaboration

French energy major Total has joined the Mærsk Mc-Kinney Møller Center for Zero Carbon Shipping as a strategic partner as the company accelerates its R&D program for carbon-neutral shipping solutions.

The fifth and final MaRINET2 call results have been announced, bringing the project’s total budget for free lab, tank and open-sea testing for offshore renewables to €5 million.

Neart na Gaoithe (NnG) Offshore Wind Ltd and Eyemouth Harbour Trust (EHT) have signed a 25-year lease for the operations and maintenance (O&M) base for the 450 MW offshore wind project. Construction of the three storey, 1,040 m2 main O&M building and its two storey, 538 m2 storage warehouse in Eyemo

Shell recorded an 87 per cent decrease in its 4Q 2020 adjusted earnings due to lower oil and gas prices and production volumes.

Danish engineering company Ramboll has announced it will provide multidisciplinary engineering expertise to the Equinor’s floating solar project planned for deployment offshore Norway.