
Ørsted has awarded Boskalis with the inter-array cable installation contract for the Borkum Riffgrund 3 and Gode Wind 3 offshore wind farms in the German North Sea. The contract includes the transport, installation, and burial of a combined total of 106 inter-array cables, the Netherlands-based comp

First Subsea has opened a dedicated production facility for cable protection systems (CPSs) in Lancaster, UK, in order to meet the demand from the offshore wind market.

Combined market losses in offshore wind grew from GBP 124 million (around EUR 145 million) in 2010-2015 to GBP 500 million (around EUR 585 million) by 2020, with the average insurance claim nearly doubling from GBP 1.67 million (around EUR 2 million) to GBP 3.08 million (around EUR 3.6 million) in t

Nexans has officially opened its high-voltage subsea cable plant in Charleston, South Carolina, which is the first such facility in the United States.

The final section of the second of the three 220 kV export cable systems for the Ostwind 2 project is being laid in the German Baltic Sea, 50Hertz Transmission GmbH said. Around 170 kilometres of export cables have been laid at sea and on land over the past months to connect two offshore wind farms

NKT is expanding its presence in Poland with an execution center to prepare for the growing demand for offshore and onshore power cables driven by the development of the local offshore wind market.

Ofgem has given the green light for preparing the Final Needs Case stage of the regulatory approvals process for the East Coast subsea HVDC link that will connect Scotland and England.

Aker Solutions has secured a contract from Chevron Australia to provide the dynamic subsea umbilicals for the Jansz-Io (J-IC) subsea gas compression development located off the coast of Western Australia.

Seaway 7 is planning to begin the inter-array cable installation activities at the Seagreen offshore wind project in Scotland around 9 November.

US energy company Dominion Energy has selected the consortium of DEME Group and Prysmian as the Balance of Plant (BoP) contractors for the 2.6 GW Coastal Virginia Offshore Wind (CVOW) project. The BoP contract includes the complete package for the transportation and installation of the foundations a

Tekmar Energy has delivered the final batch of cable protection systems (CPS) for Ørsted’s Hornsea Two offshore wind farm.

Chiel van Daelen, CEO of TrustLube, tells our Live studio host Coco Kossmann about the importance of the company’s environmentally-friendly lubrication systems.

Aker Offshore Wind and Aker Clean Hydrogen, together with DNV, have used the COP26 conference to unveil a project utilising 10 GW of floating offshore wind capacity to power multiple floating installations which will produce green hydrogen for onwards transmission to a net-zero hydrogen refinery on

South Korean subsea cable manufacturer LS Cable & System and Canadian offshore wind developer Northland Power have signed a Memorandum of Understanding (MOU) on cooperation in the South Korean offshore wind market. LS was recently selected as a preferred supplier of submarine cables for Northland Po