Chevron Corporation today said that its Australian subsidiaries have signed a non-binding Heads of Agreement (HOA) with Chubu Electric Power Company Incorporated (Chubu) for the delivery of liquefied natural gas (LNG) from the Chevron-operated Wheatstone natural gas project in Australia. Under the a
Clean Energy Fuels said it has contracted with major Southeast U.S. solid waste collection, recycling and disposal company Waste Pro USA to build, operate and maintain a new CNG fueling station on Waste Pro property in Fort Pierce, FL. The private time-fill fueling facility will support the company’
A Sempra Energy unit, Cameron LNG, today said that the company has signed commercial development agreements with Mitsubishi Corporation and Mitsui & Co., to develop and construct a natural gas liquefaction export facility at the site of Cameron LNG receipt terminal in Hackberry, La. The commercial d
The Shah Deniz consortium has reached an important milestone and approved the decision to commence Front End Engineering and Design (FEED) on the estimated $25 billion Shah Deniz Stage 2 project. This was officially announced in Baku today during the meeting between the President of the Republic of
Rosneft and ExxonMobil signed yesterday agreements to implement a long-term Strategic Cooperation Agreement concluded in August 2011 to jointly explore for and develop oil and natural gas in Russia and to share technology and expertise. The agreements were signed by Rosneft President Eduard Khudaina
The American Gas Association (AGA) will host the largest global gas event to be held in 2013. One year from today, the 17th International Conference and Exhibition on Liquefied Natural Gas (LNG 17), will bring strategic and commercial leaders and technical experts together in Houston, TX for four da
GDF SUEZ said it has been selected by Andhra Pradesh Gas Distribution Corporation (APGDC), as strategic partner for the development of a floating liquefied natural gas (LNG) import terminal project, on the East coast of India. A feasibility study has been launched and would be completed by the end 2
The Bu Samra LNG carrier, with a capacity of 266,000 cubic metres, is due to arrive in the UK’s South Hook terminal on April 24, according to the Milford Haven Port Authority website. The South Hook terminal can process 15.6 million tonnes of LNG a year and is capable of delivering 21 billion cubic
Today Beach Energy released a revised timetable showing that the delivery of the Ensign Rig 965 has been delayed to the third quarter 2012. Beach Energy is working closely with the drilling company to optimise the revised schedule. The delays are largely due to industrial disputes in the USA and del
OAO NOVATEK said today that OAO Gazprom and the company have signed a Memorandum of Cooperation whereby NOVATEK and Gazprom are considering the possibility to establish a joint venture to increase liquefied natural gas (LNG) production capacity on the Yamal peninsula as well as jointly developing hy
WestSide Corporation announced that March quarter production at Meridian SeamGas was up 10.6 per cent on the December quarter as new Meridian wells continued ramping up and work overs showed results. Gross field production for the month of March of 305,019 GJ was also up 22.4 per cent from the 249,0
Total gas sales volume by Tokyo Gas of Japan for the month of March 2012 came to about 1,407.312 million m3, increased by 133.182 million m3 (+10.5%) from March 2011. In the residential sector, volume totaled 437.996 million m3, up 4.4% from March 2011, while in the business sector, the volume incre
On April 5, 2012, Poland’s Minister of Treasury Mr. Mikolaj Budzanowski paid a visit to the LNG Terminal construction site in Swinoujscie. The minister inspected the progress of construction works. In the first stage of operation, the Swinoujscie LNG terminal will enable the re-gasification of 2.5 b
The tallest structure at the PNG LNG Plant site outside Port Moresby was hoisted into place recently. Staff of Chiyoda JGE Joint Venture working with their subcontractors including Daewoo and Nippon Express installed the Main Cryogenic Heat Exchanger which stands at 54 metres tall. The heat exchange