Minister for Environment, Energy and Climate Change, Lily D’Ambrosio, today visited a beach renourishment project in Sandringham to launch the Port Phillip Bay Environmental Management Plan 2017-2027. The plan will help guide actions and investments over the next decade to ensure a healthy Port Phil
Royal Boskalis Westminster N.V. (Boskalis) saw a slight increase in revenue in the third quarter of 2017 compared to the quarterly average reported for the first half the year. Compared to the third quarter of last year both revenue and the result were considerably lower, in line with expectations,
The U.S. Army Corps of Engineers, St. Paul District, and the Souris River Joint Water Resources Board, or SRJB, are holding a public meeting to discuss the draft Souris “Mouse” River Basin Feasibility Study and Environmental Assessment on November 16. The meeting will be held at the Minot Municipal
U.S. Senate Minority Leader Charles E. Schumer and U.S. Senator Kirsten Gillibrand yesterday announced $1,206,000 in federal funding to carry out projects to reduce future flood risk to the Stockade Historic District in the City of Schenectady from the adjacent Mohawk River. The neighborhood has exp
Under a settlement agreement with the Washington state Department of Ecology, a family trust from Canada has agreed to restore a shoreline and wetland on Lake Osoyoos in Okanogan County. In winter 2013, the Teade DeVries Family Trust from Langley, British Columbia, installed without authorization a
The U.S. Army Corps of Engineers, Wilmington District, is urging the public to stay clear of construction along portions of Snow’s Cut for safety reasons as repairs for bank erosion get underway. The Wilmington District has awarded this $1.8 million contract to Civil Works Contracting to repair eros
With a $35 million loan from the Inter-American Development Bank (IDB), The Bahamas will seek to build the country’s resilience to coastal risks through sustainable coastal protection, including natural infrastructure and integrated management of the coast. The program will finance shoreline stabili
Researchers from the James Hutton Institute and partners have produced an evidence review on river and floodplain management, as part of an Evidence Directory recently launched by the Environment Agency. The Directory aims to provide better guidance on utilizing natural processes to counter flood an
The Town of Port Hedland is reaching out to the local community to ask what they value most about the coast to investigate and manage coastal erosion and any potential risk of storm tide flooding within the Port Hedland townsite. According to David Pentz, CEO of the Town of Port Hedland, the process
The Dare County has just announced that the Waterways Commission meeting will be held at 7:00 p.m. on Monday, November 13 in Manteo. Dare County Waterways Commission was created by the County Board of Commissioners in January, 1983. The mission of the board has evolved over the time to include the r
Dragflow, an Italian manufacturer of heavy duty pumps and complete dredging equipment, recently installed their hydraulic pump HY85HC and 2 hydraulic excavators EXHY20 at a quarry pond in Japan. According to Dragflow, a Japanese quarry company was in trouble – as a result of the stone and sand wash
Works to protect the Wandobah Road area from future flood events are set to begin sometime next week, reports the Gunnedah Shire Council. According to the announcement, Gunnedah Shire Council resolved to accept a tender from Daracon Group to undertake works on the Blackjack Creek Flood Mitigation Pr
The final Fountain Lake dredging permit request came back from the Department of Natural Resources with a smaller-scale project approved than the Shell Rock River Watershed District (SRRWD) requested, the district said in their latest release. The district requested permit for the removal of approxi
Arcadis yesterday announced that the Port of San Francisco has selected CH2M in partnership with Arcadis to lead the design and engineering for the 10-year Seawall Resiliency Project. The total fee for the contract amounts to $40 million. In an approximately equal partnership, Arcadis and CH2M will