Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Equipment

Loading filters...
Business & FinanceTechnologyProject & TendersOperations & Maintenance
Great News for Suffolk County Coastal Storm Resiliency Project
Equipment

Great News for Suffolk County Coastal Storm Resiliency Project

Governor Andrew M. Cuomo today announced that the New York State Department of Environmental Conservation (DEC) has signed legal agreements with the U.S. Army Corps of Engineers and Suffolk County, and authorized $68 million in State financing, as part of a three-phase $207 million coastal storm ris

about 12 years ago
Pulse Opens New Production and Testing Facility (USA)
Equipment

Pulse Opens New Production and Testing Facility (USA)

Pulse Structural Monitoring Inc., an Acteon company, has opened a new, purpose-built facility in Katy, Texas, that will provide modern office, production and testing facilities in an established industry hub. The modern 740-m2 facility will support Pulse’s expansion plans in the North American marke

about 12 years ago
Chelsea Technologies Develops Shallow-Water Hydrocarbon Sensor
Equipment

Chelsea Technologies Develops Shallow-Water Hydrocarbon Sensor

Irelands, Marine and Environmental Sensing Technology Hub (MESTECH) use Chelsea UviLux to detect hydrocarbon levels in Lower Liffey Estuary. Tim Sullivan and Dian Zhang of MESTECH recently deployed a Chelsea Technologies Group hydrocarbon sensor on a trial basis in the Lower Liffey Estuary. This sen

about 12 years ago
Liebherr – HS 8300 HD in Dredging Application (VIDEO)
Equipment

Liebherr – HS 8300 HD in Dredging Application (VIDEO)

The Liebherr HS 8300 HD Hybrid duty cycle crawler crane weighing over 350 tonnes offers a powerful hybrid drive. When designing the new duty cycle crawler crane Liebherr paid special attention to an extended service life of the machine. In the animation you can see this machine in dredging applicati

about 12 years ago
CGG lands $200M Pemex job
Equipment

CGG lands $200M Pemex job

CGG announced today that Pemex recently awarded CGG a contract worth close to US $200m for ocean bottom cable (OBC) 3D-4C seismic work in one of the oil company’s most important producing areas, the Ku Maloob Zaap oil field and the light crude oil fields of the Bay of Campeche in the Gulf of Mexico.

about 12 years ago
ABPmer Extends Coastal Realignment Database
Equipment

ABPmer Extends Coastal Realignment Database

Recognizing that there are many ways to work with natural processes at the coast, ABPmer has extended their coastal realignment Online Marine Registry (OMReg) to a wider range of practical shoreline adaptation techniques. It now includes shoreline restorations, “unmanaged” realignments and projects

about 12 years ago
COSL Pioneer to Drill for Statoil at Visund Nord
Equipment

COSL Pioneer to Drill for Statoil at Visund Nord

Statoil Petroleum AS has received consent to use the COSL Pioneer semi-submersible drilling rig for drilling and completion of wells 34/8-C-2 H and 34/8-C-2 AH at Visund Nord. The activity is scheduled to begin in August, with a duration of around 120 days. Visund is an oil field located east of the

about 12 years ago
France: Rohr-Idreco Delivers New Clamshell Dredge
Equipment

France: Rohr-Idreco Delivers New Clamshell Dredge

The Rohr division of Rohr-Idreco Dredge Systems has announced the successful start-up of another new Floating Gantry 8m3 Clamshell deep digging dredge in France. This dredge is being used to replace an old 6m3 Rohr Gantry Clamshell dredge, which Rohr has rebuilt and sold to another customer. The new

about 12 years ago
Panama Canal: International Maintenance Congress Approaches
Equipment

Panama Canal: International Maintenance Congress Approaches

Experts from the United States, Latin America and Europe will participate in the second Panama Canal International Maintenance Congress, scheduled for August 27 – 29, 2014, within the framework of the waterway’s centennial. The main theme of this three-day event will be “Investing in Maintenance: Ke

about 12 years ago
Chart delivers first skid mounted LNG station to Gasrec
Equipment

Chart delivers first skid mounted LNG station to Gasrec

Chart Industries said that Chart Ferox, its unit in the Czech Republic, has supplied its first skid mounted LNG refuelling station to Gasrec’s Bridgwater site in the UK. The station includes a 30m3 horizontal LNG storage tank, submerged transfer pump & LNG dispenser all mounted within a single frame

about 12 years ago
Cal Dive Sees Loss at USD 29 Mln
Equipment

Cal Dive Sees Loss at USD 29 Mln

Cal Dive International, Inc. has reported a second quarter 2014 loss of $29.1 million, or $0.31 per diluted share, on revenues of $121.7 million. Included in the loss for the second quarter 2014 is a $6.2 million after-tax charge for the provision of doubtful accounts related to a receivable owed by

about 12 years ago
Mainstream Conducts ‘Neart na Gaoithe’ OWF Site Survey
Equipment

Mainstream Conducts ‘Neart na Gaoithe’ OWF Site Survey

Mainstream Renewable Power has recently started its detailed geotechnical and geophysical survey of the proposed Neart na Gaoithe offshore wind farm site. The survey work has started on August 4th 2014 and will continue until approximately September 30th 2014. The planned wind farm site is located i

about 12 years ago
PSA Identifies Serious Breaches of Regulations on Statfjord C (Norway)
Equipment

PSA Identifies Serious Breaches of Regulations on Statfjord C (Norway)

PSA Norway has reported that the investigation of the hydrocarbon leak of 26 January 2014 on Statfjord C by the Petroleum Safety Authority Norway (PSA) identified serious breaches of the regulations. Operator Statoil has now been notified of an order by the PSA. The hydrocarbon leak occurred while s

about 12 years ago
Normandie 3 Subsea Cable Jointing in Progress
Equipment

Normandie 3 Subsea Cable Jointing in Progress

Work on jointing the Normandie 3 subsea cable to the Jersey land cable has started, last week, in the transition bay at Long Beach car park. The operation by Prysmian’s specialist engineers is expected to take about two weeks. The corresponding land/sea transition joint in France was completed last

about 12 years ago
  • 1
  • …
  • 1147
  • 1148
  • 1149
  • …
  • 1895