Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Equipment

Loading filters...
Business & FinanceOperations & MaintenanceProject & TendersResearch & Development
SeaRoc: First Maintenance Visit to Forewind’s Dogger Bank Met Masts Complete
Equipment

SeaRoc: First Maintenance Visit to Forewind’s Dogger Bank Met Masts Complete

SeaRoc Group, a specialist provider of marine and engineering services for offshore renewable energy projects, has successfully completed the first major maintenance visit to Forewind’s Dogger Bank meteorological (met) masts in the North Sea at the beginning of June. The East (DB-MME) and West (DB-M

about 12 years ago
MacGregor receives AHTS deck equipment order (Indonesia)
Equipment

MacGregor receives AHTS deck equipment order (Indonesia)

MacGregor, part of Cargotec, has secured a contract with the Marco Polo Shipyard Pte Ltd with their facilities in Batam, Indonesia, to supply deck equipment for two 76m, 9,000kW anchor handling tug supply (AHTS) vessels with bollard pulls of 150 tonnes, to be constructed for Marco Polo Marine. The

about 12 years ago
DSM mooring services for ‘Maersk Discoverer’
Equipment

DSM mooring services for ‘Maersk Discoverer’

Deep Sea Mooring (DSM) has won the contract to provide a comprehensive range of mooring services to Maersk Drilling for its sixth generation, semi-submersible drilling rig Maersk Discoverer. DSM will now design, engineer and install the mooring system for the rig. “This is the first time we’ve worke

about 12 years ago
DSM to Design, Engineer and Install Mooring System for ‘Maersk Discoverer’
Equipment

DSM to Design, Engineer and Install Mooring System for ‘Maersk Discoverer’

Deep Sea Mooring (DSM) has won the contract to provide a comprehensive range of mooring services to Maersk Drilling for its sixth generation, semi-submersible drilling rig Maersk Discoverer. DSM will now design, engineer and install the mooring system for the advanced rig. “This is the first time we

about 12 years ago
GTT: SloShield will improve LNG carriers efficiency
Equipment

GTT: SloShield will improve LNG carriers efficiency

GTT and its partner Cryovision launched an innovative monitoring system to help reduce the effects of liquid motion in LNGCs, including extra boil-off of LNG cargo, due to “sloshing” inside the vessel’s tanks. The new tool, SloShield™, uses an advanced algorithm that allows LNG carrier crews to cons

about 12 years ago
Unique System FZE Installs EM 2040 on Bayanat Vessels
Equipment

Unique System FZE Installs EM 2040 on Bayanat Vessels

Unique System FZE has recently supported a significant hydrographic project that included the installation of Kongsberg’s EM 2040 multibeam echo sounder units for “Bayanat for Mapping & Surveying Services (Bayanat)” in 2 different vessels at Abu Dhabi, UAE. Bayanat is a wholly-owned Mubadala company

about 12 years ago
IRM Systems: Operators Must Have Emergency Pipeline Repair System
Equipment

IRM Systems: Operators Must Have Emergency Pipeline Repair System

In the wake of four major pipeline accidents in June, emergency preparedness is taking center stage. IRM Systems notes that these incidents are a dramatic reminder of the random threats that can affect pipelines, and the urgency for having an Emergency Pipeline Repair System (EPRS) in place. “Operat

about 12 years ago
Valeport Launches New UV-SVP
Equipment

Valeport Launches New UV-SVP

Production is now underway on Valeport’s latest innovation – the new UV-SVP – a small and compact direct reading package aimed primarily at AUV and ROV users, which delivers high accuracy data to compliment survey work. Valeport’s UV-SVP (Underwater Vehicle – Sound Velocity Profiler) is based on the

about 12 years ago
SMD to Build PROD4 for Benthic
Equipment

SMD to Build PROD4 for Benthic

SMD has announced that the company has been selected to build Benthic’s PROD4 (Portable Remotely Operated Drill). Benthic, a global geosciences company, has announced plans to augment its PROD fleet with the contracted build of PROD4 expected to enter service in Q3 of 2015. PROD4 will be an enhanced

about 12 years ago
Myanmar: CGG Launches Subsurface Imaging Center
Equipment

Myanmar: CGG Launches Subsurface Imaging Center

CGG has recently inaugurated an open subsurface imaging center in Yangon to service and support anticipated growth in Myanmar’s oil and gas exploration sector. The new center is the first of its kind to be opened in Myanmar by a major international geoscience company. The inauguration ceremony was

about 12 years ago
VIDEO: Teledyne in Deep Tow Vehicle Build
Equipment

VIDEO: Teledyne in Deep Tow Vehicle Build

Teledyne Benthos and Teledyne RESON are developing a new deep tow vehicle for Odyssey Marine Exploration. The vehicle is equipped with a SeaBat 7125 Multibeam Sonar and will be used to find shipwrecks on the seabed in very deep waters. The Vehicle will be about four meters long and are to be towed w

about 12 years ago
CGG expects increased pace of exploration activity in Myanmar
Equipment

CGG expects increased pace of exploration activity in Myanmar

CGG announced today its recent inauguration of an open subsurface imaging center in Yangon to service and support anticipated growth in Myanmar’s oil and gas exploration sector. The new center is the first of its kind to be opened in Myanmar by a major international geoscience company. The inaugurat

about 12 years ago
SCHOTTEL Tidal Generators Drive Renewables Forward
Equipment

SCHOTTEL Tidal Generators Drive Renewables Forward

The Canadian SCHOTTEL subsidiary Black Rock Tidal Power Inc. (BRTP) has recently won a demonstration berth in the Bay of Fundy, known for its high tidal range. BRTP will install SCHOTTEL tidal generators (STG) on a Triton platform developed by Tidal Stream Ltd. in which SCHOTTEL holds shares. The de

about 12 years ago
ABB Improves Skagerrak 3 HVDC Safety Systems
Equipment

ABB Improves Skagerrak 3 HVDC Safety Systems

ABB has commissioned the upgrade of the control and protection system of the Skagerrak 3 HVDC link between Norway and Denmark. The installation and commissioning time was only four weeks to minimize outage time. In addition to the system upgrade, the delivery included control of the bipolar configur

about 12 years ago
  • 1
  • …
  • 1201
  • 1202
  • 1203
  • …
  • 1895