Polarcus Amani has mobilized for a 4,400 sq. km RIGHTBAND 3D multi-client survey in the Southern Porcupine basin, offshore Ireland. The multi-client project, being acquired in collaboration with ION GeoVentures and GeoPartners, will be the largest ever 3D multi-client seismic survey acquired offshor
Ezra Holdings Limited, a leading contractor and provider of integrated offshore solutions to the oil and gas industry, today announced that the Group’s Subsea Services division, EMAS AMC, has achieved the significant milestone of installing 50 platforms for Chevron in the Gulf of Thailand. Under a m
Global renewable energy company Mainstream Renewable Power today unveils the first three-dimensional scale model of the SuperNode which is set to fundamentally change the way electricity is delivered to our homes. Developed by Mainstream, the SuperNode will, for the first time enable electricity to
Royal IHC (IHC), the global leader in shipbuilding for the dredging and offshore industries, has reached an agreement to sell 100% of its shares in its subsidiary IHC Sealing Solutions. The new owners are Willem Steenge, who as CEO is partly responsible for the strong growth of IHC Sealing Solutions
FoundOcean was awarded ‘Top Sub-Contractor’ status for the North Sea Edvard Greig development, following completion of the foundation grouting for the 134m jacket structure in May 2014. Saipem Project Manager David Fleet praised FoundOcean for their proficiency. “We wanted to recognise the thorough
Electromagnetic Geoservices ASA, specialists in Controlled-Source Electromagnetic Surveying (CSEM), is using 6G technologies from Sonardyne International Ltd. to provide redundancy and improved precision in EM source positioning. The technology will also be used to position and retrieve EM seabed re
Jeppesen has been awarded a contract to develop and implement an Integrated Hydrographic Management System (IHMS) for the Maritime and Port Authority (MPA) of Singapore, a governmental agency established to develop Singapore as a premier global hub port and international maritime center, as well as
Inpex said that Ichthys LNG project is preparing for the next phase of its onshore construction effort, following the unloading of its first large pre-fabricated modules on June 29. The modules will be used to construct the project’s LNG processing facilities at Bladin Point near Darwin, Australia.
Harkand has completed the project management and engineering for the mobilization of Siem Spearfish in Port Fourchon, Louisiana after arriving just nine days earlier from the Vard facility in Norway. The newbuild multi-purpose service vessel (MPSV) was designed and built with input from Harkand – pa
With the foundation of a joint venture between REEDEREI NSB and offshore specialist OFFCON GmbH, the MPOV (Multi-Purpose-Offshore-Vessel) project with the newly developed vessel types MPOV-62 and MPOV-32 takes a major step towards becoming reality. The MPOV-Wind family is tailor-made to the requirem
Ballarat will receive new flood flow gauges along key waterways to better inform the area of potential flooding, Minister for Water Peter Walsh announced today. Mr Walsh said the $56,000 project was the first stage in developing a total flood warning system for Ballarat and would involve the install
KBA Training Centre (KBAT) has announced a new diving training, Dive Technician Course that aims to develop the all-round competence of the dive technician in support of the diving system maintenance and equipment. The course will be available in Singapore and Aberdeen, Scotland. Competent and well-
Wood Group Kenny (WGK) has been awarded an engineering services contract to support Tullow Ghana Limited and its partners through the execution phase of the Tweneboa, Enyenra and Ntomme (TEN) project, offshore Ghana. WGK will provide subsea, umbilical, risers, flowlines (SURF) engineering services.
The Port of Hastings Development Authority has announced that the specialist surveys to collect information on the physical characteristics of land and seabed regions around Western Port will be finished by the end of August. The geotechnical and geophysical survey programs began in December and wer