UK oil and gas engineering firm, FES International, has secured a $2.5M (£1.5M) contract to supply one of its latest products, the automated Diverless Bend Stiffener Connector (DBSC) to NOV Flexibles. NOV Flexibles has called on the subsea technology services of FES International as part of Subsea 7
On the 18th and 19th June, 2014, the IADC/CEDA “Environmental Aspects of Dredging” Course was hosted by HR Wallingford at their headquarters in Howbery Park, Wallingford, UK. With a total of 27 delegates attending from France, UK, Netherlands, Belgium, Qatar, Ireland and Colombia, the presentations
Following the expansion to Fujairah and Gothenburg, GAC EnvironHull is now offering its HullWiper underwater hull cleaning service at the UAE port of Sharjah. The HullWiper Remotely Operated Vehicle (ROV) unmanned underwater hull cleaning unit uses adjustable pressure sea water jets as the cleaning
UK oil and gas engineering firm, FES International, has secured a $2.5M (£1.5M) contract to supply one of its latest products, the automated Diverless Bend Stiffener Connector (DBSC) to NOV Flexibles. NOV Flexibles has called on the subsea technology services of FES International as part of Subsea 7
Since World War II, sea mines have damaged or sunk four times more U.S. Navy ships than all other means of attack combined, according to a Navy report on mine warfare. New sonar research being performed by the Georgia Tech Research Institute (GTRI) could improve the Navy’s ability to find sea mines
Bentley Systems, Incorporated, the leading company dedicated to providing comprehensive software solutions for sustaining infrastructure, announced the availability of its MOSES software for hydrostatic and hydrodynamic analysis of offshore platforms and vessels under the Bentley SELECT licensing pr
The next meeting of the Hudson River PCBs Site Community Advisory Group (CAG) is scheduled for Thursday, June 26, 2014, at the Saratoga Town Hall (12 Spring Street, Schuylerville, NY, 12871). A Community Advisory Group (CAG) is made up of representatives of diverse community interests. Its purpose i
The main goal of the Keansburg beach replenishment program was to create a wider, higher beach and to restore the dunes. The USACE’s New York District placed nearly one million cubic yards of sand onto three miles of shoreline along Raritan Bay to repair and restore the previously-engineered beach a
Rosneft and ExxonMobil, within the framework of the Sakhalin-1 Consortium, have finished transport operation on transportation and installation of a unique sea drilling platform Berkut, which has the biggest upper part in the world, at Arkutun-Dagi on North East shelf of Sakhalin Island. The adjustm
IMS latest delivery to the Philippines, the company’s Model 5012 LP Versi-Dredge has been successfully operational since early 2014 in Marikina River. IMS commemorated the occasion by presenting a replica of the Model 5012 LP Versi-Dredge to Mayor Del R. De Guzman and his city engineers. The dredge
A contract was signed in Sweden on June 19, 2014, for a major project to make alterations to an existing lock in the Södertälje canal in the city of Södertälje near Stockholm. The canal itself will be widened and deepened. Dutch engineering and consultancy firm Witteveen+Bos and its Swedish partner
Congressman Frank Pallone, Jr. (NJ-06) yesterday hosted a meeting with the Army Corps of Engineers and the New Jersey Department of Environmental Protection (NJDEP) to revisit concerns previously expressed by fishermen, surfers and recreational users regarding the Elberon to Loch Arbour Beach Replen
Technip has been awarded two contracts by Maersk Oil for the Valdemar & Roar Gas Lift project as well as the Rolf Replacement Pipeline project, located on the Danish Continental Shelf, approximately 250 kilometers offshore Esbjerg, Denmark. The scope of work will include: – fabrication and installat
The INPEX-operated Ichthys LNG Project has welcomed the semi-submersible pipelay barge SEMAC-1 to the Northern Territory, Australia. The arrival of the 188 metre-long Saipem-operated vessel at the Darwin Outer Port Limits signals the start of important work on the Project’s 889 kilometre gas export