Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Equipment

Loading filters...
Business & FinanceTechnologyResearch & DevelopmentProject & TendersOperations & Maintenance
Picture of the Day: Rockaway Beach Replenishment (USA)
Equipment

Picture of the Day: Rockaway Beach Replenishment (USA)

The U.S. Army Corps of Engineers, New York District, is placing roughly 3.5 million cubic yards of sand along Rockaway Beach from Beach 19th to Beach 149th to replace sand lost during Hurricane Sandy. This work will restore the beach to its design profile – making it better than it was before Sandy’

about 12 years ago
USA: Houston Ship Channel Dredging Begins in May
Equipment

USA: Houston Ship Channel Dredging Begins in May

The Houston Ship Channel dredging scheme is scheduled to commence next month, announced the U.S. Army Corps of Engineers, Galveston District. RLB Contracting Inc. will perform maintenance dredging within the Houston Ship Channel from Carpenters Bayou to Greens Bayou and in the deep-draft portion of

about 12 years ago
GE, PEMEX, IMP pen technology cooperation pact
Equipment

GE, PEMEX, IMP pen technology cooperation pact

GE Oil & Gas, Mexico’s state-owned oil and gas company Petróleos Mexicanos (PEMEX), and the Mexico Institute of Petroleum (IMP), have signed a technology collaboration agreement focused on the oil and gas sector, with the sponsorship of PEMEX. The agreement, which was signed on April 8, will initial

about 12 years ago
Climb aboard, explore Bristow’s new helicopter at OTC 2014
Equipment

Climb aboard, explore Bristow’s new helicopter at OTC 2014

Bristow Group, which operates the largest fleet of commercial helicopters in the world for offshore transport to oil and gas platforms, will appear for the first time at the Offshore Technology Conference (OTC) 2014. Visitors to Bristow’s air-conditioned booth #917 will have a first-time glimpse of

about 12 years ago
VIDEO: Long Branch Beach Replenishment Underway (USA)
Equipment

VIDEO: Long Branch Beach Replenishment Underway (USA)

The U.S. Army Corps of Engineers is repairing and restoring previously constructed coastal projects like the Sea Bright to Manasquan project throughout the region. The work at Long Branch is one of four contracts that were awarded to repair and restore beaches from Sea Bright to Manasquan in norther

about 12 years ago
Westport, Weichai Initiate Development of WD10 Engine with HPDI 2.0 Technology
Equipment

Westport, Weichai Initiate Development of WD10 Engine with HPDI 2.0 Technology

Westport Innovations announced the launch of final customer validation units of the next generation Westport high pressure direct injection (Westport™ HPDI 2.0) on the Weichai Westport WP12 engine platform. The Weichai Westport WP 12 HPDI is China’s first engine featuring Westport HPDI technology, d

about 12 years ago
6 Alpha to Provide UXO Survey and Risk Management Advice for TenneT
Equipment

6 Alpha to Provide UXO Survey and Risk Management Advice for TenneT

6 Alpha Associates, the strategic advisor for managing high risk offshore initiatives, has signed a long-term framework contract with TenneT, the European grid operator responsible for connecting offshore wind projects to the German electricity network. The agreement will see 6 Alpha Associates prov

about 12 years ago
Statoil hires VIKING for safety equipment maintenance
Equipment

Statoil hires VIKING for safety equipment maintenance

Although its safety management offering, called the VIKING Offshore Safety Agreement, was released only last year, marine and fire safety equipment leader VIKING Life-Saving Equipment has already had a number of significant wins. Among these is a newly inked, multi-year servicing contract signed wit

about 12 years ago
NES receives propulsion deal for Esvagt’s newbuildings
Equipment

NES receives propulsion deal for Esvagt’s newbuildings

Norwegian Electric Systems recently got the contracts for two diesel electric propulsion systems for Esvagt’s newbuildings, hull no. 1085 and 1086. The vessels are going to be built in Singapore, and these are NES’ 5th and 6th deliveries to Esvagt in 2 years. The scope of supply for each vessel incl

about 12 years ago
AGR, Det norske Sign Frame Agreement for Well Services
Equipment

AGR, Det norske Sign Frame Agreement for Well Services

AGR has been awarded a frame agreement with Det norske to provide well services and consultancy resources to the operator’s projects on the Norwegian Continental Shelf (NCS). The frame agreement starts May 1, 2014 with duration of three years. The possible additional two plus two years’ extension wi

about 12 years ago
ITT to showcase its products at OTC 2014
Equipment

ITT to showcase its products at OTC 2014

ITT Corporation has announced that the company will showcase its extensive array of essential products and services for customers in the global oil and gas industry May 5-8 at the annual Offshore Technology Conference in Houston, which draws approximately 90,000 attendees from more than 120 countrie

about 12 years ago
‘Normand Cutter’ arrives at Damen Shiprepair yard
Equipment

‘Normand Cutter’ arrives at Damen Shiprepair yard

Solstad’s Multi Purpose Offshore Vessel “Normand Cutter” has arrived at Damen Shiprepair yard in Rotterdam. Damen Shipyards Group has announced through social media that the vessel arrived at the yard for the following repair items: overhaul of all four main engines, overhaul of the 300-ton SWL Nati

about 12 years ago
Spain: French Pottery Dredged Up in Port of Mahon
Equipment

Spain: French Pottery Dredged Up in Port of Mahon

A piece of mid 19th century French pottery from Bordeaux has been found during the archaeological supervision carried out as part of the dredging work at the Port of Mahon. The dredger Antignano arrived at the Port of Mahon recently and joined the dredging work currently underway in the Mahon waters

about 12 years ago
RWE Installs Foundations at Gwynt y Môr
Equipment

RWE Installs Foundations at Gwynt y Môr

RWE Innogy UK has successfully completed the installation of all 160 foundations at the world’s second largest wind farm, Gwynt y Môr. The final transition piece was installed on Wednesday 23rd April more than eight miles off the North Wales coast by RWE’s jack up installation vessel, Friedrich Erne

about 12 years ago
  • 1
  • …
  • 1308
  • 1309
  • 1310
  • …
  • 1895