Following more than a year of extensive research and analysis, JAXPORT has finalized a new Strategic Master Plan to lead the port and the Northeast Florida region into the future. This roadmap to success was developed using internal trade and capacity analytics as well as in-depth assessments of ind
Oilfield equipment maker Cameron today reported record quarterly and yearly revenues. Orders booked in the fourth quarter of 2013 totaled $3.3 billion Cameron reported earnings per share for the fourth quarter of 2013 of$1.00, excluding charges. This compares to earnings per share for the fourth qua
KONGSBERG has been appointed as the supplier and integrator of all electrical, telecom and integrated control systems for the new Petrofac JSD 6000 deepwater derrick lay vessel, to be built at the Shanghai Zhenhua Heavy Industry Co., Ltd (ZPMC) yard in China for Petrofac UK. The contract worth more
Oscilla Power, Inc. (OPI) announced the successful completion of its 2013 open ocean testing, conducted at Isle of Shoals, NH. OPI’s prototype system was deployed in mid-July and recovered in mid-September, 2013. For nine weeks, two of OPI’s “Gen 1” magnetostrictive power generators operated accordi
Fugro has been awarded two contracts to perform cable burial and survey operations at two wind farm sites in the UK. The first contract is for CT Offshore A/S at RWE Innogy’s Gwynt y Môr Offshore Wind Farm located in Liverpool Bay off the North Wales coast. The work involves the burial and post-buri
Deltares has announced that Bert van der Valk, geologist at Deltares, was a co-author of the book ‘Schatten van het Mammoetstrand. Over speuren in grondlagen, opgraven onder water en vissen naar fossielen’. (Treasures of the Mammoth Beach. About investigating in the earth, excavating below water and
Fugro has been awarded two contracts to perform cable burial and survey operations at two wind farm sites in the UK. The first contract is for CT Offshore A/S at RWE Innogy’s Gwynt y Môr Offshore Wind Farm located in Liverpool Bay off the North Wales coast. The work involves the burial and post-buri
UC Berkeley assistant professor Reza Alam, an engineer and an expert in wave mechanics is looking to harness the power of ocean waves with the seafloor “carpet” he is proposing that will convert ocean waves into usable energy. “There is a vast amount of untapped energy in the oceans, and with increa
QinetiQ North America (QNA) announced that it was awarded a three-year strategic contract for ocean modeling, remote sensing, and physical oceanography programs to support the Naval Research Laboratory (NRL) at Stennis Space Center, MS. Ocean circulation patterns, temperatures and depths are constan
STATS were contracted by a major oil producer to supply high pressure isolation plugs to provide a double block and bleed isolation barrier for the safe tie-in of a replacement section of the main 24-inch oil export line from the platform, without having to de-oil the entire 80km pipeline. To facili
STATS were contracted by a major oil producer to supply high pressure isolation plugs to provide a double block and bleed isolation barrier for the safe tie-in of a replacement section of the main 24-inch oil export line from the platform, without having to de-oil the entire 80km pipeline. To facili
Congressman Frank Pallone, Jr. (NJ-06) announced yesterday that the Federal Emergency Management Agency (FEMA) will study the levee system in North Middletown, New Jersey and its impact on flood hazard maps in response to his request. Pallone has been working with local elected officials and communi
An amended cleanup plan for the 10.6-acre Green I Landfill site near Logan on Hunters Woods Rd. in Green Township (Hocking County) will be the focus of a Feb. 12, 2014, Ohio EPA information session and public hearing. The meeting will begin at 6 p.m. at Ohio EPA’s Southeast District Office, Room 100
A feasibility report and integrated environmental assessment, or EA, have been prepared to describe the findings of the Lynnhaven River basin ecosystem restoration study and to assess the potential impacts of the project on the Lynnhaven River basin and surrounding area. The purpose of the study was