Subsea 7 Inc , one of the world’s leading subsea engineering and construction companies, confirms that the North Sea pipeline bundle* contract award it announced on 9th August 2010 is for the ConocoPhillips Jasmine discovery in the Central North Sea. The Subsea 7 workscope includes the engineering,
Power Team® introduces Predator Series – its newest line of high performance hydraulic pumps and tools serving the global bolting industry. This family of high performance hydraulic products raises performance and reliability to a new level. A new generation torque wrench features more efficient and
An Aberdeen-based subsea firm has been awarded a £30,000 grant to develop a specialist underwater tool. Ecosse Subsea Systems was recently awarded the grant by Scottish Enterprise to assist in the research and development of SCAR, a specialist trenching plough designed to operate from vessels of opp
Dril-Quip, Inc. today announced net income of $27.7 million, or $0.69 per diluted share for the three months ended September 30, 2010, versus net income of $25.1 million, or $0.63 per diluted share for the third quarter of 2009. Total revenues were $140.1 million during the quarter ended September 3
Oil States International, Inc. announced today that Oil States Industries, its wholly owned subsidiary headquartered in Arlington, Texas, was awarded contracts valued at approximately $29 million by FloaTEC de Mexico S.A. for tendon mooring equipment for a tension leg platform (TLP) located in the C
In October Cargotec has secured EUR 10 million order from the Sinopacific Group in China for the supply of a further 16-shipsets of anchor-handling systems for BOURBON’s newbuildings. The shipsets will be delivered between April 2011 and February 2012. This contract follows an order placed in June t
Oceaneering International, Inc. announced that it has secured a contract with the BC-10 Consortium, operated by Shell, to supply umbilicals for the development of BC-10 Phase II offshore Brazil in the Campos Basin. The order is for hybrid subsea pump and steel tube production control umbilicals tota
The Ichthys Project (INPEX Browse, Ltd. 76%, Operator, and Total E&P Australia 24%) today released the Invitation to Tender (ITT) for the semi-submersible Central Processing Facility (CPF) to be located at the Ichthys Gas Field (WA-37-R) in the Timor Sea, approximately 200 kilometres off the northwe
Cargotec has delivered liquefied natural gas-powered (LNG) terminal tractors that fully meet California’s 2010 California Air Resources Board (CARB) standards for off-road vehicle emissions, while improving on the performance of equivalent diesel-powered units. Twelve Kalmar Ottawa 4×2 terminal trac
STX Offshore & Shipbuilding, the South Korean shipbuilder, recently delivered the ‘Castillo de Santisteban’ to Empresa Naviera Elcano, the globally active Spanish shipping group. Five MAN dual-fuel 8L51/60DF engines will power the 300-metre long LNG carrier with each delivering 8,000 kW at 514 rpm.
STEP Offshore, a wholly-owned subsidiary of Aker Solutions, has won a contract from Awilco Drilling Limited to engineer and deliver mud mixing and solids control systems to the Arctic II rig. STEP Offshore estimates that the value of the work will be approximately NOK 12 million(Approximately USD $2
FMC’s scope of supply will include 11 subsea trees rated at 10,000 psi and two production manifolds. The company will also supply an artificial lift manifold containing four subsea gas/liquid separation and boosting modules, as well as related subsea controls. The subsea system will be engineered an
Meridian Systems, the Plan-Build-Operate technology solutions leader for project-based organizations, announced today that David Boland, Inc. has selected the Prolog® solution to standardize construction management processes for its complex federal construction projects nationwide. David Boland, Inc
During the period 16-19 August 2010, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil Petroleum AS’ (Statoil) facilitation of future efficient and sound handling of materials on the Troll A facility. The audit activity was carried out through a start-up meeting at Statoil’