
Oil major Shell has terminated early its contract for the Aban Offshore-owned jack-up drilling rig operating for Shell in Brunei.

Australian energy giant Woodside has confirmed its commitment to taking the delayed Scarborough gas project in Australia forward.

Australia’s Beach Energy is preparing to drill the Artisan offshore exploration well, which has been delayed due to the Covid-19 pandemic.

Triangle Energy has entered into an agreement with Pilot Energy to acquire an interest in an offshore in the Perth Basin and agreed to enter into a wind & solar JV.

Karoon Energy has completed the acquisition of a 100 per cent operating interest in the Baúna field, located in the Santos Basin offshore Brazil.

Hess Corporation has completed the sale of its interest in the Shenzi field, located in the deepwater Gulf of Mexico, to BHP.

The number of active offshore rigs in the U.S. dropped by one unit last week, according to data by Baker Hughes.

Seismic surveys have for decades been a key part of offshore exploration, producing comprehensive imagery of sub-bottom rock formations that allow the location and evaluation of oil and gas deposits. They also find their use in assessments of the seabed for offshore construction, installations of re

Oslo-listed SeaBird has recognised net loss of $3.9 million for Q3 2020, against net loss of $5 million in the same period in 2019. The seismic player recorded revenues of $3 million in Q3, an 81 per cent drop compared to $16 million in Q3 2019. The company had quarterly vessel utilization of 28 per

PetroRio has signed binding documents with Gas Bridge for the sale of the 10% interest held by the company in the Manati gas field located offshore Brazil.

Total has suffered delays with the Tyra Redevelopment Project due to the Covid-19 pandemic. As a result, the first production has been postponed to 2023.

Offshore drilling contractor Noble Corporation has decided to sell five of its cold-stacked drilling rigs.

McDermott has made the second shipment of topside modules for an FPSO unit for MODEC just weeks after the first shipment of modules sailed away.

Production shut-ins and project delays caused by the busy storm season in the Gulf of Mexico resulted in Talos recording a decrease in quarterly revenues.