
Siemens Energy has selected the German company Pfisterer for the supply of turnkey cable systems for the BorWin4 and DolWin4 offshore grid connections in the North Sea. Pfisterer is in charge of implementing the entire 66 kV AC cable infrastructure between the gas-insulated switchgear (GIS) transfor

Geophysical survey operations and a static fishing gear survey are taking place within the Inch Cape offshore wind farm site and its associated export cable corridor from February 19 until the end of April. On behalf of Inch Cape Offshore Limited, a joint venture between ESB and Red Rock Renewables,