
Energean has signed an EPC contract with Kanfa for the supply of a second, 700-tonne oil train for the Energean Power FPSO.

South Carolina Ports Authority (SCPA) has received two ship-to-shore cranes for Wando Welch terminal, completing its fleet of 15 new ship-to-shore cranes with 155 feet of lift height.

The North American terminal operator LOGISTEC USA has placed an order for two new eco-efficient mobile harbor cranes from Finnish manufacturer Konecranes with the aim of reducing marine carbon footprint in Florida.

One-on-one with GustoMSC’s sales and business development manager Gerben Roks on heavy lift cranes in the offshore wind industry, trends and innovations.

Heerema Marine Contractors’ giant Thialf vessel has removed Shell’s Goldeneye wellhead platform after installing the structure in 2003.

Murphy Oil is on schedule to achieve the first oil from its Gulf of Mexico fields in 1H 2022 as the King’s Quay FPS has reached Texas.

Ithaca Energy has started decommissioning operations at a field located in the UK sector of the North Sea, using a giant heavy lift vessel.

McDermott has completed the transportation and installation subcontract of the SVDN gas and condensate developments offshore Vietnam.

Heerema Marine Contractors’ Sleipnir has installed the first new Tyra topsides for TotalEnergies’ project in the Danish North Sea.

ADNOC Logistics & Services (ADNOC L&S), the shipping and maritime logistics arm of the Abu Dhabi National Oil Company (ADNOC), has created a strategic partnership with Roll Group to strengthen its turnkey integrated logistics offering.

Only a day after Aker BP announced it installed the Hod B platform topsides offshore Norway, Dutch offshore contractor Heerema Marine Contractors shared photos of the process.

Norwegian oil company Aker BP has installed the Hod platform topsides in the North Sea, offshore Norway, just one year and two months after the first steel cut.

Heerema Marine Contractors’ giant heavy-lift vessel Thialf has installed the Cassia Compression platform for bp Trinidad and Tobago LLC.

A new method to install offshore wind turbines is said to cut installation time by 89 per cent, minimise noise pollution and vibrations, and significantly lower the installation costs.