Ireland is ‘ideally positioned to become a global market leader in wave and tidal energy production,’ according to Tony Lewis, the organizer of the European Wave and Tidal Energy Conference (EWTEC) 2017.
The final preparations are happening for Marine Energy Event to be held on 11 October 2017 together with partners EWA (Dutch Energy from Water Association) and DMEC (Dutch Marine Energy Center). We are proud to announce our full list of speakers.
A new European project, named Kraken, has officially started aiming to develop a viable robotic arm to be used with remotely operated vehicles (ROVs) for the inspection, repair and maintenance (IRM) of ocean energy devices.
The manager of the seabed in Scotland, Crown Estate Scotland, has made offshore spatial data relating to the organization’s offshore assets freely available for the first time.
French tidal energy developer Sabella has engaged the services of Olympic Shipping’s multi-purpose vessel Olympic Taurus for the installation of new cable part related to the Ushant island tidal energy project.
Tidal Energy Today has compiled the top news from tidal and wave energy industry from August 21 – 27, 2017.
While floating wind developers usually look for low wave energy sites, Floating Power Plant’s device is meant to generate wind power in areas with medium to high wave energy, as the company’s hybrid technology aims to harness energy from both sources.
A new study has found that the presence of SeaGen tidal turbine in Strangford Lough in Northern Ireland did not prevent harbor seals from passing through the channel, detecting some small effects in their movement associated with the device.
Schottel Hydro is finalizing the preparations for the delivery of four of its SIT 250 tidal turbines to Sustainable Marine Energy for the PLAT-I tidal platform.
National Renewable Energy Laboratory (NREL) and the University of Washington researchers have concluded tidal turbulence data gathering project in two Washington state waterways.
The Columbia Institute has released a study which predicts that that the construction of new tidal and wave energy generation facilities could bring over 100,000 new jobs of the Canadian construction industry by 2050.
Wood Group and Exceedence plan to present a new software platform for combined financial and engineering modelling of wave energy systems next week.
Cape Sharp Tidal has informed it is continuing with the maintenance and retrofitting operations on its tidal turbines at the Port Saint John in Canada with unspecified redeployment date.
Umbilical and power cable provider for the offshore energy industry JDR Cable Systems has appointed Richard Turner as its new Chief Executive Officer (CEO) while also receiving regulatory approval for its acquisition by TFKable.