Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Offshore Wind

Loading filters...
NewsEnvironmentStorageResearch & DevelopmentTechnologyAuthorities & GovernmentBusiness & Finance
Onshore Substation for Walney 2 Ready to Operate (UK)
Offshore Wind

Onshore Substation for Walney 2 Ready to Operate (UK)

The onshore transformer at Cleveleys near Blackpool has been tested and is now ready for energisation. The perimeter fence around the substation is in place and the substation now meets the High voltage rules with restricted access. Inside the substation the harmonic filter compound has been finishe

about 15 years ago
Onshore Substation for Walney 2 Ready to Operate (UK)
Offshore Wind

Onshore Substation for Walney 2 Ready to Operate (UK)

The onshore transformer at Cleveleys near Blackpool has been tested and is now ready for energisation. The perimeter fence around the substation is in place and the substation now meets the High voltage rules with restricted access. Inside the substation the harmonic filter compound has been finishe

about 15 years ago
Marine Management Organisation and Natural England Conduct Licence Inspection for Walney 2 (UK)
Offshore Wind

Marine Management Organisation and Natural England Conduct Licence Inspection for Walney 2 (UK)

On 29 June 2011, Marine Management Organisation and Natural England conducted a site visit at Walney 2 for inspection of the current Marine Licence. The aim of the visit was to inspect Walney Offshore Windfarms implementation of the marine mammal mitigation during piling of monopiles by Svanen. Nois

about 15 years ago
Export Cable Connects Walney 2 Substation with National Grid (UK)
Offshore Wind

Export Cable Connects Walney 2 Substation with National Grid (UK)

The export cable pull for the Walney 2 substation was completed at 04.00 on Sunday 3 July, when the export cable was pulled up to the cable deck of the offshore substation. Here the cable ends are being terminated and the fibre optic cables are currently being jointed. Export cable joint completed T

about 15 years ago
Svanen Completes Monopile Installation for Walney 2 (UK)
Offshore Wind

Svanen Completes Monopile Installation for Walney 2 (UK)

On Saturday 9 April 2011, the first monopile for Walney 2 was installed, and less than three months later all 51 monopiles have been installed. On Sunday 2 July 2011 the last of the 51 monopiles for Walney 2 was successfully driven into the sea bed, and thus the basic foundation for the 51 turbines

about 15 years ago
Scotland Turns to Sea in Their Pursuit of Renewable Targets
Offshore Wind

Scotland Turns to Sea in Their Pursuit of Renewable Targets

From his office in a converted Victorian schoolhouse, Neil Kermode can see little more than centuries-old stone buildings and narrow streets better suited to horse carts than Land Rovers. Yet Kermode, head of the European Marine Energy Centre in Scotland’s Orkney Islands, will tell you he can also s

about 15 years ago
Scotland Turns to Sea in Their Pursuit of Renewable Targets
Offshore Wind

Scotland Turns to Sea in Their Pursuit of Renewable Targets

From his office in a converted Victorian schoolhouse, Neil Kermode can see little more than centuries-old stone buildings and narrow streets better suited to horse carts than Land Rovers. Yet Kermode, head of the European Marine Energy Centre in Scotland’s Orkney Islands, will tell you he can also s

about 15 years ago
Various Wind Turbines with Same Goal, to Collect Energy (USA)
Offshore Wind

Various Wind Turbines with Same Goal, to Collect Energy (USA)

Wind turbines are getting really big — some with blades as long as a football field — and more powerful, often generating 50 times more electricity than the first generation of wind power machines built in the 1980s. But scientists are also studying how to harness the wind in different ways that cou

about 15 years ago
Update on GBP 1.2 Billion Offshore Wind Farm Progress (UK)
Offshore Wind

Update on GBP 1.2 Billion Offshore Wind Farm Progress (UK)

Community councillors in Dunbar have been updated on the progress of a proposed £1.2 billion offshore wind farm in the outer Forth estuary. Mainstream Renewable Power plans to start construction on the Neart na Gaoithe (Gaelic for ‘strength of the wind’) wind farm about 30 kilometres north of Tornes

about 15 years ago
Turbines to Harness Tidal Energy in Admiralty Inlet (USA)
Offshore Wind

Turbines to Harness Tidal Energy in Admiralty Inlet (USA)

Below the surface of America’s coastal waters could be the energy needed to power your clothes drier and other appliances. Some say the tides have the potential to power about five percent of U.S. households by producing nearly 9 GW of renewable energy. A pilot project to test this potential is in t

about 15 years ago
Ormazabal Achieves New Offshore Milestone with Custom Made Medium Voltage Switchgear (UK)
Offshore Wind

Ormazabal Achieves New Offshore Milestone with Custom Made Medium Voltage Switchgear (UK)

The Thanet offshore wind farm is the largest operational wind farm in the world. It consists of 100 turbines each with a 3MW generating capacity. The windfarm is located 11.3 km offshore from Foreness Point, in the North Sea. The WTG’s are interconnected by an offshore 33kV inter array cable network

about 15 years ago
Ormazabal Achieves New Offshore Milestone with Custom Made Medium Voltage Switchgear (UK)
Offshore Wind

Ormazabal Achieves New Offshore Milestone with Custom Made Medium Voltage Switchgear (UK)

The Thanet offshore wind farm is the largest operational wind farm in the world. It consists of 100 turbines each with a 3MW generating capacity. The windfarm is located 11.3 km offshore from Foreness Point, in the North Sea. The WTG’s are interconnected by an offshore 33kV inter array cable network

about 15 years ago
Leyland Discuses Proposed Offshore Wind Projects Off Texas Coast (USA)
Offshore Wind

Leyland Discuses Proposed Offshore Wind Projects Off Texas Coast (USA)

Migratory birds, sea turtles, jobs and aesthetics were among the issues raised Tuesday night at a presentation by Mark Leyland, senior vice president of offshore wind projects for Baryonyx Corporation, which plans to build offshore wind farms off the South Texas coast — including South Padre Island.

about 15 years ago
Centrica Presents Results for Period Ended 30 June 2011 (UK)
Offshore Wind

Centrica Presents Results for Period Ended 30 June 2011 (UK)

Operating and financial overview: *On track to deliver full year earnings growth in 2011, despite commodity price volatility, challenging economic environment and higher UK upstream gas and oil tax rates *shift in profits from the downstream to the upstream *UK residential energy operating profit* h

13 minutes read
  • 1
  • …
  • 1900
  • 1901
  • 1902
  • …
  • 2151