
UK-headquartered Enshore Subsea has secured an export cable installation contract for one of Scotland’s largest offshore wind projects, the 1.1 GW Inch Cape. The Inch Cape offshore wind farm will feature two 85-kilometer, 220 kV, three-phase export cables, each delivered in three sections and requir

Serica Energy has disclosed a delay in resuming production from its assets in the North Sea, as more time is needed to fix the issue hampering a floating production, storage, and offloading (FPSO) vessel’s performance on the UK Continental Shelf (UKCS).