Seabed Geosolutions, a joint venture between Fugro and CGG, has been awarded a contract to provide a 3D ocean bottom node (OBN) survey in 2000 meters of water in the Santos Basin, offshore Brazil. The 410-square-kilometers-survey, which has a contract value of over $50 million, will be performed for
Hai Long Offshore Wind (OFW) project signed Taiwan’s first large-scale balance of plant (BOP) preferred supplier agreement (PSA) with local company CSBC DEME Wind Engineering (CDWE). The Hai Long Project consists of Canadian-based independent power producer Northland Power International (NPI), Yusha
The trial run of the Balticconnector project’s Inkoo compressor station has been completed, ensuring that the compressor station can be commissioned according to schedule. Completing the compressor station contributes to getting the entire Balticconnector pipeline up and running according to schedul
Aquatic recently completed spooling support work scope to Airborne Oil & Gas at their base in Ijmuiden, in The Netherlands. Aquatic supplied a 200Te Powered Reel Drive System, a 15Te Tensioner System, a 200Te Under Roller System and a Level Winder System. Aquatic’s equipment and personnel assisted A
Geoquip Marine’s GMR302 drill rig has supported Solstad’s Normand Baltic in the offshore geotechnical investigation for the renewable energy sector in Taiwan. The system was mobilized onto the Normand Baltic, and assisted with the completion of the geotechnical campaign. The scope of work comprised
Subsea World News has put together a recap of the most interesting articles from the previous week (October 14 – October 20). This content is available after accepting the cookies. Change cookie-settings View on Subseaworldnews. Bhge Becomes Baker Hughes Company This content is available after accep
MarineEnergy.biz has compiled the top news from marine energy industry from October 14 – October 20, 2019. https://marineenergy.biz/2019/10/16/interregs-largest-ever-project-gets-green-light/ https://marineenergy.biz/2019/10/16/dmec-talks-renewables-at-europort/ https://marineenergy.biz/2019/10/14/i
ScottishPower Renewables has opened the new operations and maintenance building for the 714MW East Anglia ONE offshore wind farm at the Port of Lowestoft, UK. Located at Associated British Port’s Hamilton Dock, the O&M building is part of a GBP 25 million investment made by ScottishPower Renewables
Schlumberger has seen red in the third quarter 2019 on major impairments on goodwill and assets. The oilfield services giant recognized Q3 2019 loss of close to $11.4 billion, or $8.22 per share, on some $37 million higher revenue ($8.54 billion), against profit of $644 million. Excluding charges, t
Axxis Geo Solutions (AGS) has completed the Utsira multi-client ocean-bottom node (OBN) survey in the North Sea, Norway. The program is a joint effort with JV partner TGS and covers an area of approximately 1,600 square kilometres of full azimuth multi-client 3D seismic. The program has set several
Aquatic has recently completed its work scope in the offshore installation of a threaded tubing pipeline in the Mediterranean Sea. The work was done for Petrobel (a joint venture company between ENI & the Egyptian General Petroleum Company) as part of Maridive Offshore Project’s (MOP) scope aboard M
Wood has appointed Stephanie Cox as CEO of its Americas business, succeeding Andrew Stewart who has been appointed executive president of strategy and development for the global business. Responsible for the firm’s $4 billion, asset solutions business which employs around 20,000 people working acros
TechnipFMC has been awarded engineering, procurement, construction and installation (EPCI) contract by Woodside for the development of the Pyxis and Xena fields, located offshore North West Australia. TechnipFMC will design, manufacture, deliver and install subsea equipment including subsea producti
Polarcus has secured high industry prefunding for a multi-client project in Australia. The project has an approximate duration of one month, the company informed. The project will start in Q1 2020 immediately following completion of another XArray project in Australia. The previous Australian projec