Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Operations & Maintenance

Loading filters...
Business & FinanceResearch & DevelopmentTechnologyEquipmentProject & Tenders
Van Oord Wraps Up Foundation Installation at Gemini
Operations & Maintenance

Van Oord Wraps Up Foundation Installation at Gemini

Van Oord has completed the installation of the 150th foundation at the Gemini offshore wind farm. On July 01, 2015, Van Oord’s installation vessel Aeolus, together with Swire Blue Ocean’s Pacific Osprey, started installation and the last foundation was installed on October 17. The installation of th

about 11 years ago
TGS Completes 25 Pct of Gigante Seismic Program
Operations & Maintenance

TGS Completes 25 Pct of Gigante Seismic Program

TGS has acquired 46,500 kilometers (25%) of the 186,000 km 2D seismic project, Gigante in the Gulf of Mexico. The survey is being acquired with four Seabird vessels and the fifth vessel, M/V Aquila, will join the survey in early November. Gigante covers the entire deep water area of the offshore sec

about 11 years ago
Royal Navy Divers Destroy Historic Sea Mine in Scotland
Operations & Maintenance

Royal Navy Divers Destroy Historic Sea Mine in Scotland

Royal Navy divers have destroyed an historic sea mine found off the coast of Gourock on the Clyde in Scotland. The British-made S Mk6 sea mine, dating from around the time of the Second World War, was discovered by a civilian diver earlier in the week who reported it to the local authorities. Northe

about 11 years ago
EC boosts MeyGen with €17M
Operations & Maintenance

EC boosts MeyGen with €17M

The European Commission has approved the grant transfer of €17 million from the Kyle Rhea project to Atlantis’ MeyGen tidal energy project. According to Atlantis, the funding will accelerate the development of MeyGen Phase 1B, also known as project Stroma, which is expected to reach financial close

about 11 years ago
Carnegie wraps up CETO 6 concept design
Operations & Maintenance

Carnegie wraps up CETO 6 concept design

Carnegie Wave, an Australian wave energy developer, has completed the conceptual design phase of its CETO 6 project. According to Carnegie, this CETO 6 design delivers a number of advantages over previous CETO generations including an approximate four times increase in rated capacity to 1 MW, the re

about 11 years ago
Lloyd’s Register gives nod for WaveRoller
Operations & Maintenance

Lloyd’s Register gives nod for WaveRoller

AW Energy’s wave energy device, WaveRoller, has received the second endorsement from Lloyd’s Register Energy. WaveRoller’s concept design was evaluated in accordance with Lloyd’s ‘Qualification of New Technology’ and ‘Qualification Management’ standards. Lloyd’s Register Energy (LRE) stated that the

about 11 years ago
Deutsche Windtechnik Serves Dutch & Danish Offshore Wind
Operations & Maintenance

Deutsche Windtechnik Serves Dutch & Danish Offshore Wind

Deutsche Windtechnik AG has set up two new companies in other European countries: Deutsche Windtechnik BV in the Netherlands and Deutsche Windtechnik ApS in Denmark. Both companies shall initially handle orders in the offshore sector; in the medium term, however, they also plan to take on projects o

about 11 years ago
Deutsche Windtechnik Serves Dutch & Danish Offshore Wind
Operations & Maintenance

Deutsche Windtechnik Serves Dutch & Danish Offshore Wind

Deutsche Windtechnik AG has set up two new companies in other European countries: Deutsche Windtechnik BV in the Netherlands and Deutsche Windtechnik ApS in Denmark. Both companies shall initially handle orders in the offshore sector; in the medium term, however, they also plan to take on projects o

about 11 years ago
Cinia Lays New Subsea Cable to Link Finland and Germany
Operations & Maintenance

Cinia Lays New Subsea Cable to Link Finland and Germany

Cinia Group began laying the new submarine Sea Lion data cable in Helsinki, Finland. The new fiber optic subsea cable will provide a direct, low latency and cyber secure Internet backbone connection between Finland and Germany. “The sea cable initiative builds the future of Finland based on our exis

about 11 years ago
VBMS Wraps Up Drilling for Dudgeon Export Cabling
Operations & Maintenance

VBMS Wraps Up Drilling for Dudgeon Export Cabling

VBMS has completed two 1,170 meter long horizontal directional drillings at the landfall for the Dudgeon Offshore Wind Farm. The drillings were done in preparation for the installation of two 42 kilometer long export cables next year. To avoid worsening weather conditions later in season, the work w

about 11 years ago
DeepOcean to Install Cables for Walney Extension
Operations & Maintenance

DeepOcean to Install Cables for Walney Extension

DeepOcean 1 UK, a subsidiary of DeepOcean, has been awarded a contract by DONG Energy for the installation and trenching works for the Walney Extension offshore wind project in the Irish Sea. Offshore work will be performed from DeepOcean’s new cable installation vessel Maersk Connector in 2017, the

about 11 years ago
Energinet.dk to Start Anholt Cable Replacement
Operations & Maintenance

Energinet.dk to Start Anholt Cable Replacement

Energinet.dk plans to start the replacement of two sections of the cable that connects the Anholt offshore wind farm to the grid in the period between October 26 and November 23, depending on weather conditions. In February, the company discovered an error in the submarine cable that connects the An

about 11 years ago
Subsurface Warming Could Cause Methane Gas to Bubble Up, Study Shows
Operations & Maintenance

Subsurface Warming Could Cause Methane Gas to Bubble Up, Study Shows

New research conducted by the University of Washington suggests that subsurface warming could be causing more methane gas to bubble up off the Washington and Oregon coast. The study shows that of 168 bubble plumes observed within the past decade a disproportionate number were seen at a critical dept

about 11 years ago
Subsea Processing: Single Phase vs Multiphase and Pipeline Surveys
Operations & Maintenance

Subsea Processing: Single Phase vs Multiphase and Pipeline Surveys

One of many interesting technical sessions today at OEEC 2015 was Subsea Processing. The session discussed the latest developments in subsea processing solutions including water removal and re-injection or disposal, boosting, gas separation and gas compression. Experts on the topic presented the via

about 11 years ago
  • 1
  • …
  • 860
  • 861
  • 862
  • …
  • 1594