
Italian cabling giant Prysmian Group has finished laying the submarine cable for the interconnection between Tenerife and La Gomera in Spain, with the entire infrastructure expected to be completed by the end of this year. The interconnection consists of a 66 kV double-circuit line, with a 36-kilome

HyOrc has signed a definitive joint venture (JV) agreement with Start to co-develop and operate a network of green methanol plants in Portugal.