As most renewable energy systems are located outdoors, sometimes in harsh conditions ranging from the extreme cold of Inner Mongolia, Scandinavia, Canada and North Dakota to the scorching hot deserts of the United States and Australia, critical attention must be paid to the suitability and robustnes
As most renewable energy systems are located outdoors, sometimes in harsh conditions ranging from the extreme cold of Inner Mongolia, Scandinavia, Canada and North Dakota to the scorching hot deserts of the United States and Australia, critical attention must be paid to the suitability and robustnes
At the closing conference of the EU project 4POWER on November 18 in Groningen, representatives of the EU and its individual regions exchanged their experiences and views on the best practice models in the development of offshore wind energy. In the past few years, the 4POWER project promoted sharin
IMarEST announced its acquisition of Plymouth University’s Hydrographic Academy (HA). The new venture – Marine Learning Alliance Ltd. – sees IMarEST experts and HA academics develop a new suite of e-learning courses to run alongside existing Hydrographic Academy programmes. IMarEST will build on the
As part of their testing programmes at the European Marine Energy Centre (EMEC) in Orkney, Scotland, Alstom’s tidal devices have now generated over 1GWh of electricity, in actual operating conditions, to the Scottish grid. Alstom’s 1MW tidal turbine, deployed in 2013 as part of the ReDAPT project, a
Two members of Fugro’s geoconsultancy team have won prestigious international awards. The one was recently presented in London, UK and the second in Regina, Canada. The first to receive good news was Dr Kokkuen Lee, Principal Engineer at Fugro Advanced Geomechanics (Fugro AG) who received the David
The U.S. Energy Department held a live webcast titled “Economic Impacts of Offshore Wind−Market, Manufacturing, & Jobs” on Wednesday, November 19. Bruce Hamilton from Navigant Consulting Inc. presented Offshore Wind Market Report. This presentation summarized the third annual assessment of the U.S.
Minister for Portsmouth Matthew Hancock has on November 17, 2014 officially opened a new cutting edge centre for research into unmanned autonomous boats, submarines and other vessels – a market that is estimated to be worth £9 billion each year over the next 8 years. The Centre for Maritime Intellig
Monobase Wind BV has started testing its new Gravity Based Foundation at the MARIN, the Netherlands. The testing will last until November 28. The tests include transportation, installation and the in-place condition for water depth of 45 m and a 6 MW turbine. Nacelle elevation is 97 m above sea leve
WavePOD prototype produced its first power in laboratory tests this week. The tenth-scale WavePOD was officially switched on by David Waldron, Bosch Rexroth’s UK Business Manager for Machinery Applications and Renewables, to mark the start of the test programme at the world-leading Institute for Flu
The next-generation renewable energy innovators are challenged to come up with new marine renewable energy device as a part of the new competition funded by the Scottish Government. The Saltire Prize Challenge was created to accelerate the commercial development of wave and tidal energy technology.
Tidal Energy Ltd’s DeltaStream turbine is ready for deployment in Ramsey Sound. The device is currently waiting in Milford Haven, and will be deployed when the weather conditions are suitable. Tidal Energy will install and test a single 400kW unit for twelve months. The project will be used to demon
Admiral Jonathan Greenert, the Chief of Naval Operations, visited Woods Hole Oceanographic Institution (WHOI) for firsthand discussions with scientists and engineers conducting research and building technology with potential to enhance Naval capabilities and operations. Greenert toured the WHOI Labo
Rosneft has completed the geological survey program on Company’s offshore license areas for 2014. In the current year geological survey covered 24 license areas with the scope considerably exceeding license obligations. Seismic performance results included 31,503 line km of 2D seismic, and 12,939 sq