DeepFlex announced it has entered into a contract with Petrobras to conduct a qualification testing program on DeepFlex’s patented composite flexible fiber reinforced pipe components. This multi-phase, multi-year contract will include over 5,000 individual tests. This contract award demonstrates Pet
The Submarine System for Inspection (SUSI) ROV, which was developed by AREVA, is a device used for ultrasonic inspection of nuclear reactor vessel baffle bolts. The ROV’s positioning system is required to document time and exact location of each measurement taken as the ROV examines numerous bolts t
DeepOcean AS, part of DeepOcean Group Holding AS, announced the award of a two year contract valued at approximately $ 60 million from Petróleo Brasileiro S/A (“Petrobras”) E&P Services. The contract includes management, engineering, maintenance and repair of flexible pipelines and electro-hydraulic
Divers today continued a full assessment of the state of the wreck of the Rena – its stability on the reef and general condition – as the first stage of working out what to do next. “It’s extremely challenging and dangerous work,” National On Scene Commander Rob Service said, “because of the surges
Specialist Subsea Services (S3) has seen off tough competition to be named as finalists in an impressive two categories at the prestigious Subsea UK Awards. S3, the only company to reach the final in more than one category, is in the running for both the New Enterprise and Global Export awards. Grae
Unique Maritime Group, one of the world’s leading integrated turnkey subsea and offshore solution providers, sets “Strength in Depth” as its new regional and international vision during a media round table, held at UMG’s head offices in Hamriyah Free Zone in Sharjah. The international presence of th
Aquaterra Energy, the leading provider of technically-advanced offshore drilling equipment and support services, is delighted to announce that Patrick Phelan will join the company as Managing Director on 16th January 2012. Patrick joins from JDR Cable Systems Limited, where he was Managing Director
Concerns about protecting the environment during exploration and mining for deep seabed minerals will not be addressed by a ‘one size fits all’ solution. Dr Malcolm Clark, Principal Scientist (Deepwater Fisheries) at the National Institute of Water and Atmospheric Research (NIWA) Wellington, New Zea
Octanex N.L. announces that the Rissa 3D seismic survey, located within the WA-422-P permit, has been completed. The Rissa survey is the first of three new 3D seismic surveys currently being acquired in the Company’s Southern Bonaparte Basin permits. The 3D seismic surveys are being acquired within
Greatship Global Offshore Services Pte. Ltd (GGOS), a Singapore incorporated subsidiary of the Company’s subsidiary – Greatship (India) Limited (GIL), had signed contracts for two new building Multipurpose Support Vessels (Builder’s Yard No. 26775 and 26784) with Mazagon Dock Limited, Mumbai in Sept
Lundin Petroleum Norway, as operator for PL501, has completed the appraisal well, 16/5-2S located approximately 8.5 km south of the Avaldsnes discovery well 16/2-6, and 4 km south of the appraisal well 16/2-7. The objective of the 16/5-2S well was to delineate the southern flank of the Avaldsnes dis
OceanWorks International announces the delivery of two high power nodes to Harris CapRock Communications (HCC) as part of the Offshore Communications Backbone (OCB) system. The high power nodes represent an expansion of the successful OCB system which also includes the CSnet Tsunami Warning and Earl
Bahamas Petroleum Corporation announces the initial processing of the Pearl 3D seismic survey has been completed. Data quality is excellent and data volumes have been received in both time and depth. Detailed interpretation is now underway and will form the basis for well location selection, well de
Huawei Marine Networks Co., Ltd. (Huawei Marine) announced the signing of a construction contract of Hibernia Atlantic’s Global Financial Network (GFN) Project Express. Huawei Marine recently completed the first phase of the project’s marine survey work and is now commencing the manufacturing of the