Hansen Transmissions International NV announces the first deliveries of high quality 6 MW gearboxes for China’s first 6 MW wind turbine. Spearheading a new era of wind energy development in China, Hansen Transmissions has officially delivered its first made-for-China 6 MW gearboxes for the Sinovel S
Falck Nutec Teesside has revealed a brand new £550,000 extension to its existing industrial training unit. (hazardexonthenet) [mappress] Source: hazardexonthenet, October 20, 2011
Between 29th September and 1st October 2011 Liebherr-Werk Nenzing GmbH celebrated its 35th anniversary. An open day with over 20,000 visitors concluded the festivities in the Austrian village of Nenzing. Such a high attendance by far exceeded the ambitious expectations in the planning stages. The fe
The new full-power converter design by The Switch features top fault ride-through (FRT) capability, allowing better grid side performance. The new converters match the most stringent grid code in the world to date, the German BDEW 2008 directive, and they also comply with E.ON 2006, Transmission Cod
Tentec’s Aero range of bolt tensioning equipment for the installation and maintenance of wind turbines are now the tools of choice for installation and maintenance engineers on the world’s largest operational offshore wind farm – Thanet. Following highly successful trials, comments on the bolt tensi
Tentec’s Aero range of bolt tensioning equipment for the installation and maintenance of wind turbines are now the tools of choice for installation and maintenance engineers on the world’s largest operational offshore wind farm – Thanet. Following highly successful trials, comments on the bolt tensi
The Forewind consortium will employ an innovative new foundation design concept next year when it installs two meteorological masts on the Dogger Bank offshore wind farm zone, located between 125 and 290 kilometres off the North Yorkshire coast. Forewind Limited, developers of the Dogger Bank zone,
Leading renewable energy consultancy group, Natural Power, has released results showing the performance of the first batch of ZephIR 300 units manufactured and deployed earlier this year, following the launch of the product in November 2010. The sample of fifteen ZephIR 300s show all units exceeding
Leading renewable energy consultancy group, Natural Power, has released results showing the performance of the first batch of ZephIR 300 units manufactured and deployed earlier this year, following the launch of the product in November 2010. The sample of fifteen ZephIR 300s show all units exceeding
Cargotec has won a contract to supply ten state-of-the-art Kalmar automatic stacking cranes and 17 customer specific automatic shuttle carriers to leading terminal services’ provider TraPac Inc, in Los Angeles, USA. The equipment will be delivered to TraPac Inc, a subsidiary of Mitsui OSK Lines, in
The pieces of what could one day change the whole electrical power industry in Florida don’t look impressive. By James Kirley (tcpalm) [mappress] Source: tcpalm, October 17, 2011
The pieces of what could one day change the whole electrical power industry in Florida don’t look impressive. By James Kirley (tcpalm) [mappress] Source: tcpalm, October 17, 2011
Following the recent order for 48 cranes by REpower Systems SE, PALFINGER WIND is again in the headlines winning a tender for 111 offshore wind platform cranes to be delivered to DONG Energy, Denmarks leading energy company. Deliveries will already start in January next year for the Anholt Offshore
Seatec received an order for the delivery of a complete Hopper Dredger Instrumentation package. The complete package includes: – Angle transmitters, – Inclination sensors, – Pressure sensors and – Junctionboxes and all Subsea Cabling. Delivery of the complete system will be end of 2011. About Compan