DSC Dredge, based in Reserve, Louisiana, delivered earlier this year its first-ever dredge equipped with a Tier 4 Final C32 ACERT Caterpillar engine to a minerals company located in the United States. This Shark Class Dredge features an 18-inch hull-mounted dredge pump and 300 hp cutter drive assemb
UK-based turbine blade access and repair specialist Altitec has delivered the last of an initial batch of five ActSafe ACX powered ascenders to the installation team at the Rampion offshore wind farm.
A MHI Vestas V164 wind turbine has caught fire at the Østerild – National Test Centre for Large Wind Turbines in Denmark, according to local media.
A MHI Vestas V164 wind turbine has caught fire at the Østerild – National Test Centre for Large Wind Turbines in Denmark, according to local media.
Wello Oy has informed that Penguin wave energy converter (WEC) has now been operational 150 days since its deployment from the beginning of March. The 1MW Penguin WEC was installed at the European Marine Energy Centre’s (EMEC’s) grid-connected wave test site at Billia Croo by Orkney-based Green Mari
Strukton Immersion Projects B.V has chartered Iceni Marine Services’ crew transfer vessels (CTVs) – Iceni Spirit and Iceni Courage – to support the company during the installation of the five gravity based foundations at the Blyth Demonstrator project over the summer.
Uljanik has completed installation of the cutter ladder for one of the world’s largest cutter suction dredgers, the self-propelled vessel the Croatian shipbuilder is currently constructing for Jan De Nul Group. According to the official announcement, cutter ladder is equipped with two main lines, dr
Mampaey Offshore Industries has developed and delivered the first iMSL Small Scale system for the world’s first LNG-powered trailing suction hopper dredgers (TSHD) Minerva and Scheldt River. The transfer of the liquefied natural gas from ships required a linked ESD system to ensure a controlled shut
Eneco Windmolens Offshore B.V. is looking for a provider of turbine gearbox supply and refurbishment services on the Princess Amalia offshore wind farm (Prinses Amaliawindpark) in the Dutch North Sea. The anticipated scope of work comprises providing gearboxes, new or refurbished, for the purpose of
Boskalis Plastic Bomb Grid has been nominated for the IADC – International Association of Dredging Companies – Safety Award 2017. The presence of unexploded ordnance (UXO) and the high risk of explosions is a pervasive hazard to dredging activities. To minimize damage which can be caused to a hopper
The Scottish Government has invested a further GBP 1.5 million in the Carbon Trust’s collaborative research, development and demonstration (RD&D) programme – the Offshore Wind Accelerator (OWA).
The Scottish Government has invested a further GBP 1.5 million in the Carbon Trust’s collaborative research, development and demonstration (RD&D) programme – the Offshore Wind Accelerator (OWA).
PanGeo Subsea has secured a contract to carry out an unexploded ordnance (UXO) survey on an offshore wind farm in the North Sea.
In cooperation with British cable manufacturer JDR, Pfisterer has received an order for the delivery of CONNEX cast resin joints and CONNEX plug connectors for up to 72.5kV for the networking of the 714MW East Anglia ONE offshore wind farm.