Ampelmann has announced the launch of its latest gangway for personnel transfer: the A-type Enhanced Performance (AEP).
Atlantis Resources has reinstalled and reconnected two of the four turbines of the MeyGen tidal array Phase 1A project.
Tidal Energy Today has compiled the top news from tidal and wave energy industry from July 3 – 9, 2017.
East Coast Oil and Gas Engineering (EC-OG) will over the weekend conduct retrieval and redeployment operation of its Subsea Power Hub system at the European Marine Energy Centre (EMEC).
Bombora Wave Power has concluded the sea trials of its mid-scale wave energy prototype in Western Australia.
The MaRINET2 project has awarded €1.3 million to 34 technology development teams to accelerate the development of next generation offshore renewable energy technologies.
Britain and Ireland’s largest trade union Unite has called the UK government to stop stalling on the creation of over 2,000 jobs and unleash an economic boost worth at least £500 million to the Welsh economy, by giving the green light to the Swansea Bay tidal lagoon project.
Ireland’s Centre for Marine and Renewable Energy (MaREI) and the Lir National Ocean Test Facility (Lir-NOTF) have won awards during Ireland’s national maritime festival SeaFest for their contribution to the development of marine renewables.
Overflow systems are designed to optimize the efficiency of the dredging process by draining excess water and leaving more weight available for the payload, thus limiting the amount of turbulence in the hopper. During the overflow process, the aim is to remove excess water from the hopper, making ro
Tidal Lagoon Power (TLP) has filed the final assessment of the impact on fish for Swansea Bay tidal lagoon project to Natural Resources Wales as part of marine license procurement process.
The launch ceremony of Shanti Sagar 18 – an 8,000m³ standardized trailing suction hopper dredger (TSHD) – took place today at Royal IHC’s shipyard in Krimpen aan den IJssel, the Netherlands. This is the second of two Beagle 8 TSHDs for Adani – the first (Shanti Sagar 17) was launched in March 2017.
Swedish tidal energy developer Minesto hosted a study visit from the members of the Maestrale project which aims to lay the basis for Maritime Energy Deployment Strategy in the Mediterranean.
European Union’s Horizon 2020 has selected Nova Innovation to lead the project that aims to increase the commercial viability of tidal power through tidal arrays optimization.
The European Commission has sent a Statement of Objections to General Electric (GE) alleging the company breached EU merger rules by providing incorrect or misleading information in connection to the takeover of LM Wind Power. In the Statement of Objections, the Commission has informed GE of its pre