
Nexans has completed the manufacturing and factory acceptance testing (FAT) of 100 kilometers of subsea cable for the second electrical interconnector between Malta and Italy, with the cable now ready for load-out and installation. The IC2 interconnector will consist of a new 122-kilometer-long, 225

French engineering, advisory, and project management services company DORIS is working alongside Perenco Brazil, part of Anglo-French oil and gas player Perenco, to bring two offshore platforms that have been offline since 2020 back to life, while employing electrification to cut greenhouse gas (GHG