German shipbuilder, Fassmer, has been commissioned by the Federal Maritime and Hydrographic Agency (BSH) to build an LNG-fueled survey, wreck search and research vessel.
U.S. Army Corps of Engineers, Philadelphia District is wrapping up operations at Dewey Beach Delaware. According to the Corps, the beachfill project involves pumping some 650,000 cubic yards of sand onto Dewey and Rehobeth beaches to reduce the risk of storm damages. The project, managed by USACE an
The IHC Beagle is one of the Royal IHC’s latest developments in the dredging sector. The IHC Beagle series have been designed with a number of standard features which are fitted on all types and sizes. These include a high quality IHC dredge pump, the innovative hull shape and an ergonomically desig
Mitsubishi Corporation on Thursday informed it plans to deploy a new LNG carrier for the Cameron LNG project in the United States.
Belgium’s Exmar has agreed to sell its FSRU business to Vopak, as well as to cooperate with the Dutch terminal operator on future projects.
Rotterdam Offshore Group (ROG) has completed the conversion of Boskalis’ multi-purpose vessel (MPV) Ndeavor. The vessel, built in 2013, has the length of 99m, beam of 30m, and gross tonnage of 7413 ton. Prior to the conversion, the MPV was equipped with rock dumping equipment. This included 8 stone
San Diego-based shipbuilder General Dynamics NASSCO christened the Liberty, the third LNG-ready product tanker being built for SEA-Vista.
Brittany Ferries signed a letter of intent with the Flensburger Schiffbau shipyard in Germany to construct a new LNG-fueled ship.
The German Waterways and Shipping Authority (WSV) has ordered a new trailing suction hopper dredger (TSHD) from Pella Sietas Shipyard, Hamburg. The new dredger, worth around €95 million, will be funded through the company’s ‘Future Investment Program’, the WSV said in its announcement. The newbuild,
REN’s Sines LNG terminal located on Portugal’s Atlantic coast is scheduled to receive a cargo of the chilled fuel from Qatar in January.
WASA Dredging has announced that the construction of two 1010m³ self-propelled split barges named ‘Boann’ and ‘Sinann’ is moving ahead according to schedule. The vessels are designed in-house WASA and are standard WASA SHB 1010 split-barges. The complete construction of these barges is taking place
Peru’s only liquefaction facility at Pampa Melchorita dispatched another cargo of liquefied natural gas to Spain.
Fluxys-operated Zeebrugge LNG terminal has booked its first cargo of liquefied natural gas for 2017.
South Korea’s Daewoo Shipbuilding & Marine Engineering has secured an order to build a floating storage and regasification unit (FSRU) for Maran Gas Maritime, a unit of Greece’s Angelicoussis Shipping Group. Under the deal signed on Friday, DSME is to build a 173,400-cbm FSRU for Maran Gas. The cont