
European Offshore Wind Deployment Centre (EOWDC), also known as Aberdeen Offshore Wind Farm and “famous” for being the offshore wind project the current U.S. President Donald Trump fought against, is estimated to bring the Aberdeenshire area more than GBP 100 million (around EUR 110 million) over it

Australian government has dedicated AUD 4.8 million (around € 2.9 million) from its 2020-2021 Federal Budget to the development of a regulatory framework related to offshore renewables. According to the budget document, the funds will “support the development of a regulatory framework for offshore c

CWind Taiwan has been awarded a balance of plant (BOP) contract for the Formosa 1 offshore wind farm. The company is providing inspection and maintenance services to the 22 turbines at Formosa 1 Phase 1 and Formosa 1 Phase 2 sites, including internal and external inspections and painting. Under the

First foundation for the Kincardine project, the world’s largest floating wind farm, has arrived in Rotterdam, from where the floating wind turbines will be installed off Scotland. The foundation was transported from the fabrication yard in Spain to Rotterdam on board Boskalis’ semi-submersible barg

The wind turbines at the Hornsea Two offshore wind farm in the UK do not feature the usual setup including boat landing structures and ladders, as its developer Ørsted purchased a novel lifting system. The 1.4 GW project is the first-ever offshore wind farm to deploy the Get Up Safe (GUS) motion-com

A workforce training collaborative has been established in the U.S. State of Virginia to offer certifications required for operations and maintenance of offshore and onshore wind farms. The Mid-Atlantic Wind Training Alliance, announced by Virginia’s Governor Ralph Northam on 14 October, will bring

Offshore Wind Consultants (OWC) has completed the identification of geohazards in the Polish sector of the Baltic Sea that offshore wind developers should address when planning projects. According to OWC, Poland’s Baltic Sea is covered by various kinds of sediments, ranging from loam through fine‐gr

The 12 MW Coastal Virginia Offshore Wind (CVOW) pilot project has completed reliability testing and is now ready to enter commercial service. The next significant regulatory step for the two-turbine project is to submit the final documentation to the Bureau of Ocean Energy Management (BOEM) which wi

The Offshore Renewable Energy (ORE) Catapult and the Offshore Robotics for Certification of Assets (ORCA) Hub will collaborate on translating UK robotics innovation and research expertise into products and services for the offshore renewables’ industry. ORE Catapult and ORCA Hub will utilise both th

Waves Group has secured a contract to provide marine warranty surveyor services for the Dogger Bank offshore wind project in the UK. Waves Group is providing the services for Dogger Bank A, which involves the installation of foundations, infield cables, turbines, export cables and one offshore subst

Thirty-nine out of 58 Siemens Gamesa 8.4 MW turbines have been installed at the SeaMade offshore wind project in Belgium. According to Aspiravi, one of the project owners, 36 of the Siemens Gamesa units are operational. DEME Group’s jack-up vessel Apollo installed the first turbine at the project si

SSE Renewables has issued a tender seeking a company to provide the turbine substructure FEED and detailed design for the second phase of the Arklow Bank offshore wind farm. SSE has developed a substructure concept that includes a monopile and transition piece which shall provide the basis for comme

Gavin & Doherty Geosolutions (GDG) will carry out a review of data and information requirements of offshore renewable energy within the INFOMAR seabed mapping programme that has been underway in Ireland. The Irish geotechnical engineering consultancy has been commissioned by Geological Survey Irelan

Windar has sent off the last wind turbine tower sections for the SeaMade offshore wind project in Belgium. Special purpose vessel Rotra Ventre set sail with the last six tower sections from Windar’s facilities in the port of Avilés, Spain, to the Port of Ostend, where the REBO sites are serving as s