Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
Offshore WindAuthorities & GovernmentBusiness Developments & ProjectsProject & TendersBusiness & FinanceResearch & DevelopmentFoundationsInnovationSubseaSurveys & InterventionsSafetyRegulation & PolicyRules & Regulation
Ireland-Speeds-Up-Seven-Offshore-Wind-Projects
Wind Farms

Ireland speeds up seven offshore wind projects

The Irish government has designated seven offshore wind projects as relevant, meaning they will be fast-tracked through the new marine planning regime. The selected projects include the Oriel, innogy’s Bray and Kish Banks, Codling I and II, Skerd Rocks and North Irish Sea Array (NISA) wind farms. Th

about 6 years ago
A photo of Siemens Gamesa turbines at sea, selected for the Formosa 2 project in Taiwan
Wind Farms

Stonepeak enters mezzanine debt with AMP to back Taiwan offshore wind investment

New York-based Stonepeak Infrastructure Partners has entered a USD 145 million mezzanine debt agreement with AMP Capital to support the acquisition of Swancor Renewable Energy and the construction of the Formosa 2 offshore wind farm in Taiwan. “The transaction represents our first infrastructure deb

about 6 years ago
Third WindFloat Atlantic turbine being towed to site
Wind Farms

Final WindFloat Atlantic turbine ready to go home

The last of the three floating wind turbines for the WindFloat Atlantic project will soon set sail from Spain to its designated location off Portugal. Tractebel Engie reported on 17 May that it fully assembled the third WindFloat Atlantic platform in the port of Ferrol. The turbine should start its

about 6 years ago
A photo of an offshore wind farm on a calm day at sea
Wind Farms

Romania: Hidroelectrica reveals 300–500 MW offshore wind farm plan

Romania’s power producer Hidroelectrica has outlined plans for what could be the country’s first offshore wind farm, and the first project of its kind to be installed in the Black Sea. The offshore wind farm, planned to be built by 2026, will have a capacity of between 300 MW and 500 MW, subject to

about 6 years ago
Neart-na-Gaoithe-Soon-to-Continue-Construction-After-COVID-19-Pause
Wind Farms

Neart na Gaoithe offshore wind farm soon to continue construction after COVID-19 pause

Construction of the Neart na Gaoithe (NnG) offshore wind farm in Scotland is planned to begin this week after a pause due to the coronavirus pandemic. According to Matthias Haag, NnG Project Director, construction of the project was paused in March and is now expected to continue after the latest go

about 6 years ago
Final Trianel Windpark Borkum II wind turbine standing installed at sea, with Blue Tern vessel next to it
Wind Farms

Trianel Windpark Borkum II in full array

The 32nd and final wind turbine at the Trianel Windpark Borkum II (TWBII) site was installed on Sunday, 17 May. “The last big components were installed Saturday, and final bolt and nut Sunday early morning”, Fred. Olsen Windcarrier informed on 18 May. Fred. Olsen Windcarrier was contracted in Februa

about 6 years ago
North-Carolina-Issues-Call-for-Offshore-Wind-Supply-Chain-Study
Wind Farms

North Carolina issues call for offshore wind supply chain study

The North Carolina Department of Commerce has issued a Request for Proposals (RFP) to solicit an offshore wind supply chain and infrastructure assessment. The analysis will identify North Carolina’s existing strengths and capabilities relating to the offshore wind sector, and help develop a strategi

about 6 years ago
OffshoWind Turbine Foundation
Wind Farms

Innovation meets fast-moving market

Scott Whyte is a geotechnical engineering consultant with global geo-intelligence and asset integrity solutions provider, Fugro, and a DEng student at the University of Oxford within the Renewable Energy Marine Structures (REMS) centre group. His joint industry consultancy and academic activities fo

about 6 years ago
Survey vessel Geoquip Saentis docked
Wind Farms

Geotechnical surveys to begin at Vineyard Wind site

Geoquip Marine is set to begin geotechnical surveys in the northern portion of the Vineyard Wind Lease Area around 20 May. The geotechnical data acquisition company will be conducting surveys from its vessel Geoquip Saentis for four to six weeks. Geoquip Marine Group carried out a geotechnical surve

about 6 years ago
Siemens-Gamesa-Kicks-Off-Personnel-Safety-Training
Wind Farms

Siemens Gamesa kicks off personnel safety training

DuPont Sustainable Solutions (DSS) has begun working with Siemens Gamesa’s Offshore business unit on training approximately 6,000 employees in developing greater risk awareness to improve safety. The companies partnered to implement DuPont Risk Factor training, as well as group leadership coaching f

about 6 years ago
Kriegers Flak's foundation being installed, a close-up photo of the installation frame on the vessel
Wind Farms

Van Oord installs first foundation at Kriegers Flak offshore wind farm

The first foundation at the Kriegers Flak offshore wind farm is now in place. Van Oord’s heavy lift vessel Svanen arrived at the project site off Denmark a few days ago to begin the installation work. The vessel will install a total of 72 monopile foundations, with the work expected to be completed

about 6 years ago
UK-Extended-Comment-Period-for-Proposed-CfD-Changes
Wind Farms

UK extends comment period for proposed CfD changes

The UK government has extended the comment period for the proposed amendments to the Contracts for Difference (CfD) scheme due to the COVID-19 crisis. The consultation period was initially supposed to end on 22 May but has been extended to 29 May to give more time for sending responses. To remind, t

about 6 years ago
Germans-Asking-for-Offshore-Wind-CfD-and-Capacity-Target
Wind Farms

Germans asking for offshore wind CfD and capacity target

The Association of German Wind Farm Operators (BWO) and WAB are calling for a long-term reliable investment and financing framework for offshore wind projects in Germany that would require the introduction of contracts for difference (CfD) and dialogue on a long-term expansion target until 2035. In

about 6 years ago
Lithuania opens with 700 MW offshore wind pitch
Wind Farms

Lithuania opens with 700 MW offshore wind pitch

Lithuania’s Ministry of Energy has submitted a draft Government Resolution to stakeholders for coordination on locations in the Baltic Sea suitable for offshore wind farms. Proposals were also submitted regarding the capacities of the wind farms which could potentially meet a quarter of Lithuania’s

about 6 years ago
  • 1
  • …
  • 162
  • 163
  • 164
  • …
  • 508