Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
NewsBusiness & FinanceProject & TendersStorage
Wood to Prep Equinor’s O&G Platforms for Offshore Wind
Wind Farms

Wood to Prep Equinor’s O&G Platforms for Offshore Wind

Wood has been awarded a new contract by Equinor to deliver modifications to two offshore installations in the Norwegian North Sea to connect electric power from the Hywind Tampen floating wind farm. Equinor’s project replaces energy generated by gas turbines with electricity from the 88MW floating w

about 6 years ago
Equinor Completes Polish Offshore Wind Trifecta
Wind Farms

Equinor Completes Polish Offshore Wind Trifecta

Norway’s energy major Equinor has completed the acquisition of a 50 % interest in the offshore wind development project Bałtyk I in Poland from Polenergia. The Bałtyk I offshore location license allows for development of a wind farm with a capacity up to 1560MW of which Equinor will hold 50%. The co

about 6 years ago
Equinor Completes Polish Offshore Wind Trifecta
Wind Farms

Equinor Completes Polish Offshore Wind Trifecta

Norway’s energy major Equinor has completed the acquisition of a 50 % interest in the offshore wind development project Bałtyk I in Poland from Polenergia. The Bałtyk I offshore location license allows for development of a wind farm with a capacity up to 1560MW of which Equinor will hold 50%. The co

about 6 years ago
K2 Management Reveals Dogger Bank Role
Wind Farms

K2 Management Reveals Dogger Bank Role

K2 Management is working as Lender’s Technical Advisor (LTA) on the Dogger Bank Creyke Beck A and B Wind Farms, two of the three projects which make up the Dogger Bank development. In September, all three wind farms, which make up the Dogger Bank development, were selected in the Contracts for Diffe

about 6 years ago
Bladt Loads Out Second Batch of Borssele 1+2 TPs
Wind Farms

Bladt Loads Out Second Batch of Borssele 1+2 TPs

Bladt has completed the second load out of transition pieces for the Borssele 1+2 offshore wind project in the Netherlands. According to the company, the second load out of the 26m tall transition pieces took place last week. Ørsted’s Borssele 1+2 will comprise 94 Siemens Gamesa 8MW turbines install

about 6 years ago
Bureau UK Joins Triton Knoll Roster
Wind Farms

Bureau UK Joins Triton Knoll Roster

Staffing and recruitment specialist Bureau UK has secured a framework agreement to provide resourcing to support the quality assurance, quality control, and surveillance activities across the Triton Knoll offshore wind project. Bureau UK is sourcing engineers to undertake work around Quality and Pro

about 6 years ago
East Anglia One Reaches Halfway Turbine Installation Mark
Wind Farms

East Anglia One Reaches Halfway Turbine Installation Mark

The East Anglia One offshore wind project has reached the halfway turbine installation milestone with the 51st Siemens Gamesa turbine put in place. DEME Group’s vessel Sea Installer completed the installation of 51 out od 102 Siemens Gamesa 7MW turbines at the project site 43km off the Suffolk coast

about 6 years ago
East Anglia One Reaches Halfway Turbine Installation Mark
Wind Farms

East Anglia One Reaches Halfway Turbine Installation Mark

The East Anglia One offshore wind project has reached the halfway turbine installation milestone with the 51st Siemens Gamesa turbine put in place. DEME Group’s vessel Sea Installer completed the installation of 51 out od 102 Siemens Gamesa 7MW turbines at the project site 43km off the Suffolk coast

about 6 years ago
Equinor Picks Prysmian Inter-Array Cables Offshore New York
Wind Farms

Equinor Picks Prysmian Inter-Array Cables Offshore New York

Equinor has signed an agreement with the Prysmian Group for the supply of inter-array cables for the Empire Wind offshore wind project in New York. Prysmian revealed that it is responsible for the design, supply and storage of approximately 150km of 66kV XLPE-insulated inter-array cables, which will

about 6 years ago
Trianel Windpark Borkum II Turbines Halfway There
Wind Farms

Trianel Windpark Borkum II Turbines Halfway There

The Trianel Windpark Borkum II (TWBII) offshore wind project has reached the halfway turbine installation point as 16 out of 32 units have been erected. Jan De Nul’s jack-up vessel Taillevent installed the 16 Senvion 6.2M152 turbines in the northeastern part of the project site offshore Germany, wit

about 6 years ago
Trianel Windpark Borkum II Turbines Halfway There
Wind Farms

Trianel Windpark Borkum II Turbines Halfway There

The Trianel Windpark Borkum II (TWBII) offshore wind project has reached the halfway turbine installation point as 16 out of 32 units have been erected. Jan De Nul’s jack-up vessel Taillevent installed the 16 Senvion 6.2M152 turbines in the northeastern part of the project site offshore Germany, wit

about 6 years ago
ZTT Hands Over Hohe See Grid Link
Wind Farms

ZTT Hands Over Hohe See Grid Link

China’s Zhongtian Technology [ZTT] has completed work on the grid connection between the EnBW Hohe See offshore wind farm and the BorWin3 DC grid connection system in the North Sea. In March 2017, TenneT tapped ZTT to carry out the engineering, procurement and construction (EPC) of the 155kV HVAC co

about 6 years ago
ZTT Hands Over Hohe See Grid Link
Wind Farms

ZTT Hands Over Hohe See Grid Link

China’s Zhongtian Technology [ZTT] has completed work on the grid connection between the EnBW Hohe See offshore wind farm and the BorWin3 DC grid connection system in the North Sea. In March 2017, TenneT tapped ZTT to carry out the engineering, procurement and construction (EPC) of the 155kV HVAC co

about 6 years ago
EEW OSB Wraps Up Borssele TP Tests on Completion
Wind Farms

EEW OSB Wraps Up Borssele TP Tests on Completion

EEW Offshore Structures (Britain) has carried out the final Test on Completion for Ørsted’s Borssele contract. The Teesside-based company was tasked with manufacturing and delivering a total of 35 transition pieces for the 752MW Borssele 1 + 2 wind farm in the Dutch North Sea. ALE Heavy Lift is prov

about 6 years ago
  • 1
  • …
  • 180
  • 181
  • 182
  • …
  • 504