The first MHI Vestas 8.3MW wind turbine has been installed on Vattenfall’s 406.7MW Horns Rev 3 wind farm in the Danish North Sea.
Developers of the Mermaid and the Seastar wind farms in the Belgian North Sea have merged the two projects into one – the 487.2MW Seamade.
Scotland’s largest offshore wind farm, the 588MW Beatrice, has started generating power for the first time.
The Deutsche Bucht Mono Bucket pilot demonstrator project has reached financial close, Northland Deutsche Bucht GmbH said.
Jiangsu Longyuan Zhenhua Marine Engineering (Longyuan Zhenhua) has signed two new offshore wind contracts in China, one for two met masts off the Guandong province and the other for construction works on a project in the Liaoning province.
Van Oord’s cable lay vessel Nexus has loaded the final set of inter-array cables for the Borkum Riffgrund 2 offshore wind farm and is currently installing them at the site in the German North Sea.
The European Investment Bank (EIB) has approved financing for an unnamed offshore wind project in Belgium as part of the EUR 3.4 billion investment package for renewable energy, energy efficiency, Near Zero Energy Buildings, hydropower and district heating projects.
Lamprell has sent off the last fully-assembled jacket foundations for the East Anglia ONE offshore wind farm from its yards in the United Arab Emirates to ScottishPower Renewables’s marshalling port in Vlissingen.
Lamprell has sent off the last fully-assembled jacket foundations for the East Anglia ONE offshore wind farm from its yards in the United Arab Emirates to ScottishPower Renewables’s marshalling port in Vlissingen.
Fred. Olsen Windcarrier’s jack-up Brave Tern has left the Port of Esbjerg in Denmark loaded with the first four wind turbines to be installed on Vattenfall’s Horns Rev 3 offshore wind farm in the Danish North Sea.
EDF Energies Nouvelles (EN) has completed the layout of the operations and maintenance (O&M) base for its Saint-Nazaire offshore wind farm in France, and has hired a local architectural firm to design the O&M building to be built in La Turballe, with a focus on landscape and environment.
EDF Energies Nouvelles (EN) has completed the layout of the operations and maintenance (O&M) base for its Saint-Nazaire offshore wind farm in France, and has hired a local architectural firm to design the O&M building to be built in La Turballe, with a focus on landscape and environment.
The cable laying vessel (CLV) Siem Aimery will commence the third inter-array cable installation campaign at the Beatrice offshore wind farm on 17 July, according to the latest Notice to Mariners from the project’s marine coordination team.
India’s Ministry of New and Renewable Energy (MNRE) will meet with the companies and the consortia which expressed their interest to develop the country’s first commercial offshore wind farm later this month.