Jan De Nul has won a contract by Senvion for the installation of wind turbine generators (WTG) at the 203MW Trianel Borkum II (TWB II) offshore wind farm in Germany.
Today, 14 February, Siemens’s Rotra Mare roll on/roll off (Ro-Ro) vessel brought the first Siemens Gamesa 7MW wind turbine components for the Rentel offshore wind farm to the REBO site in Ostend. Two blade sets and six top towers have been shipped from Esbjerg.
Schiedam-based HSM Offshore has rolled out the offshore substation topside for the 450MW Borkum Riffgrund 2 offshore wind farm from the construction hall to the yard.
Schiedam-based HSM Offshore has rolled out the offshore substation topside for the 450MW Borkum Riffgrund 2 offshore wind farm from the construction hall to the yard.
Ørsted has selected Siemens Gamesa Renewable Energy as the exclusive supplier of wind turbines for the 1.4GW Hornsea Project Two offshore wind farm.
James Fisher Marine Services (JFMS), part of James Fisher and Sons plc, is to supply E.ON with its offshore wind management system (OWMS).
The 151-metre, self-propelled, DP2, jack-up rig Seafox 5 has left the Damen Verolme Rotterdam (DVR) shipyard following a four-month refit.
GE Renewable Energy has awarded DHSS with a ships agency and port logistics services contract for the Merkur offshore wind farm in the German North Sea.
Taiwan’s Environmental Protection Administration (EPA) has not approved the Environmental Impact Assessment (EIA) for Taiwan Generations Corporation’s (TGC) 28-turbine Fuhai Offshore Windfarm off the coast of Changhua County.
Ørsted has published updated plans for the proposed Hornsea Project Three offshore wind farm, highlighting the changes that have been made as a result of feedback received through consultation events, one-to-one meetings and wider briefings with statutory bodies and interested parties.
PGE Energia Odnawialna started a two-year wind measurement campaign for its planned 1GW offshore wind farm project, after deploying a floating LiDAR in the Polish Baltic Sea at the end of January. As Offshore WIND reported earlier, Spanish floating LiDAR specialist EOLOS supplied the EOLOS FLS200 Li
Germany’s EnBW Energie Baden-Württemberg AG has agreed to acquire 37.5 percent stakes in three offshore wind projects in Taiwan with a combined capacity of around 2GW.
Construction of the first of the four projects could potentially start as early as 2019, Ørsted said.
German offshore wind developer wpd has appointed Sumitomo Mitsui Banking Corporation (SMBC) as their financial advisor for its projects in Taiwan.