Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
NewsAuthorities & Government
Eneco Luchterduinen Completed ahead of Schedule & Officially Open
Wind Farms

Eneco Luchterduinen Completed ahead of Schedule & Officially Open

The Eneco Luchterduinen offshore wind farm was put into operation, which was officially celebrated yesterday with a traditional Japanese Kagami Biraki ceremony. The wind farm, owned jointly by Mitsubishi Corporation and Eneco, comprises 43 wind turbines and is located 23 kilometres off the coast of

about 11 years ago
EnBW Baltic 2 Put into Operation
Wind Farms

EnBW Baltic 2 Put into Operation

In the presence of the Minister President of Mecklenburg-Vorpommern, Erwin Sellering, and numerous guests from the worlds of business and politics, EnBW Energie Baden-Württemberg AG has officially put its second offshore wind farm in the Baltic Sea into operation. Following a construction period of

about 11 years ago
Dong Completes Foundation Installation at Gode Wind 1, 2
Wind Farms

Dong Completes Foundation Installation at Gode Wind 1, 2

At the two offshore wind farms Gode Wind 1 and 2, the last of 97 foundations has been installed. Dong Energy achieved this milestone ahead of schedule due to smooth foundation installation. Altogether, the installation of the 97 monopiles and transition pieces took five months. Trine Borum Bojsen, M

about 11 years ago
Preparation for Rampion Construction Begins
Wind Farms

Preparation for Rampion Construction Begins

Work will begin this week at the Rampion Offshore Wind Farm, in readiness for the first foundation installation in January. This will include clearing boulders on the seabed along the cable route and around each of the 116 foundation positions to allow safe and effective installation. Chris Tomlinso

about 11 years ago
Inter Array Cabling Starts at Sandbank OWF
Wind Farms

Inter Array Cabling Starts at Sandbank OWF

By laying in the first power cable between the monopiles “SB 28C” and “SB 29C”, Vattenfall and Stadtwerke München (SWM) have started the inter array cabling of the Sandbank offshore wind farm, 90 km west of the coast of German island Sylt. Approximately 96 km of cables are to be installed within the

about 11 years ago
Inter Array Cabling Starts at Sandbank OWF
Wind Farms

Inter Array Cabling Starts at Sandbank OWF

By laying in the first power cable between the monopiles “SB 28C” and “SB 29C”, Vattenfall and Stadtwerke München (SWM) have started the inter array cabling of the Sandbank offshore wind farm, 90 km west of the coast of German island Sylt. Approximately 96 km of cables are to be installed within the

about 11 years ago
All Turbines at Kentish Flats Extension Up & Running
Wind Farms

All Turbines at Kentish Flats Extension Up & Running

All 15 turbines at Vattenfall’s Kentish Flats Extension offshore wind farm are now generating power to the National Grid. The final turbine was put to operation on September 12. The turbines will now go through a series of tests and then be handed over to the Operations and Maintenance team. Matthew

about 11 years ago
ABS Flags Safety Issues in Deepwater Wind’s Construction
Wind Farms

ABS Flags Safety Issues in Deepwater Wind’s Construction

The developer of US first offshore wind farm, Deepwater Wind, is making some safety changes after an independent consultant has identified several health and safety issues. ABS Group, a Houston-based firm listed several concerns during the construction of five foundations at the 30MW Block Island of

about 11 years ago
ABS Flags Safety Issues in Deepwater Wind’s Construction
Wind Farms

ABS Flags Safety Issues in Deepwater Wind’s Construction

The developer of US first offshore wind farm, Deepwater Wind, is making some safety changes after an independent consultant has identified several health and safety issues. ABS Group, a Houston-based firm listed several concerns during the construction of five foundations at the 30MW Block Island of

about 11 years ago
UK Thumbs Down Navitus Bay Project
Wind Farms

UK Thumbs Down Navitus Bay Project

UK government has rejected the GBP 3.5bn Navitus Bay wind farm project planned off the south coast of England. The decision to dismiss a planning application for up to 194-turbine project was announced by Energy minister Lord Bourne today. A reduced project version, comprising of up to 105 turbines,

about 11 years ago
Gwynt y Mor Project Undergoing O&M Operations
Wind Farms

Gwynt y Mor Project Undergoing O&M Operations

Greatship Manisha vessel is carrying out drilling operations at RWE’s Gwynt y Môr offshore wind farm. The activity, including borehole work as part of the geotechnical survey at one of the foundations, will last until the next Tuesday. “During the course of drilling operations the Greatship Manisha

about 11 years ago
Gwynt y Mor Project Undergoing O&M Operations
Wind Farms

Gwynt y Mor Project Undergoing O&M Operations

Greatship Manisha vessel is carrying out drilling operations at RWE’s Gwynt y Môr offshore wind farm. The activity, including borehole work as part of the geotechnical survey at one of the foundations, will last until the next Tuesday. “During the course of drilling operations the Greatship Manisha

about 11 years ago
MPI Adventure Installs Final Blade at Amrumbank West
Wind Farms

MPI Adventure Installs Final Blade at Amrumbank West

Wind turbine installation vessel, MPI Adventure, installed the final blade of the 80-turbine Amrumbank West Offshore Wind Farm earlier this week. This operation formed part of an ongoing, long-term charter-party agreement with E.On and followed a foundation installation campaign undertaken by anothe

about 11 years ago
Westermeerwind: First Blades Installed
Wind Farms

Westermeerwind: First Blades Installed

Westermeerwind has reached another milestone with the installation of the first set of wind turbine blades. The wind turbine blades arrived on Tuesday evening from Oude Zeug where they were preassembled via vessel LD27. The installation was completed the following day via ‘De Schelde’ pontoon fitted

about 11 years ago
  • 1
  • …
  • 408
  • 409
  • 410
  • …
  • 508