Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›HSHI picks GTT fuel tanks for 2 new LNG-powered container ships
Business Developments & Projects

November 19, 2021 · about 4 years ago

HSHI picks GTT fuel tanks for 2 new LNG-powered container ships

South Korean shipyard Hyundai Samho Heavy Industries (HSHI) has ordered fuel tank design from French LNG containment specialist GTT for two LNG-powered container vessels.

1 minutes read
  • LinkedIn
  • X
  • Email
HSHI picks GTT for fuel tanks of 2 new LNG-powered container ships

South Korean shipyard Hyundai Samho Heavy Industries (HSHI) has ordered fuel tank design from French LNG containment specialist GTT for two LNG-powered container vessels.

The two ships will each have a capacity of 15,600 containers. They will be equipped with LNG tanks, each holding up to 12,800 cubic metres of LNG used as fuel.

The tanks will specifically feature the Mark III Flex membrane containment technology developed by GTT.

Under the deal, GTT will provide engineering services and on-site technical assistance. In addition, it will help the operator through the first LNG-fueled project. This includes commissioning of the LNG tank, and first LNG bunkering operations; as well as further specific LNG operations and maintenance of the vessels.

Moreover, it will provide training for the crews, supported by its proprietary G-Sim training simulator. The simulator replicates the future LNG operations of the vessels.

The company will also offer its HEARS emergency response service with 24/7 technical assistance.

Additionally, GTT will fit these vessels with its GTT Digital platform, a smart shipping solution to monitor and optimize the operational performance of the vessels and further reduce their energy consumption and environmental footprint.

The deliveries of the LNG-powered vessels will occur between the fourth quarter of 2023 and the second quarter of 2024.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInfrastructureProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

21 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

21 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago