Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Equipment

Loading filters...
Business & FinanceTechnologyVesselsOperations & MaintenanceResearch & DevelopmentExploration & ProductionProject & Tenders
Huawei Marine Connects Ambergris Caye with Belize Mainland
Equipment

Huawei Marine Connects Ambergris Caye with Belize Mainland

Belize Telemedia Ltd (BTL) and Huawei Marine have delivered Strategic Evolution Underwater Link (SEUL) project, bringing fiber-optic submarine cable connectivity to San Pedro, Ambergris Caye. Stretching over 23 kilometers from the Belize mainland to the Caye, this fiber optic connectivity will be in

about 9 years ago
Royal IHC, Reimerswaal: Keel Laying Ceremony of TSHD DC Orisant
Equipment

Royal IHC, Reimerswaal: Keel Laying Ceremony of TSHD DC Orisant

The keel laying ceremony for new multi-purpose 5.450m³ trailing suction hopper dredger (TSHD) ‘DC Orisant’ took place yesterday, Reimerswaal Dredging said in its latest announcement. Launching of this TSHD is planned for the end of the year, according to the Dutch based dredging contractor. The new

about 9 years ago
Weeks Marine to Expand Its Dredge Fleet with New CSD
Equipment

Weeks Marine to Expand Its Dredge Fleet with New CSD

Weeks Marine Inc. (WMI), a marine construction and dredging contractor based in Cranford, NJ, yesterday announced the construction of a new $60 million ocean-going, 30-inch hydraulic cutter suction dredger, the J.S. Chatry. The dredger is named for Senior Vice President and Manager of Weeks Marine’s

about 9 years ago
CGG Gets Santos Basin OBN Processing Contract
Equipment

CGG Gets Santos Basin OBN Processing Contract

CGG has been awarded a contract by Petrobras to process the seismic data from a 3D Ocean Bottom Node (OBN) survey covering a full-fold area of 2180 km² in Brazil’s deepwater Santos Basin. This will be the largest node survey ever acquired and processed in the industry. The survey will be acquired by

about 9 years ago
Dana Gas chooses AGR software for exploration in Egypt
Equipment

Dana Gas chooses AGR software for exploration in Egypt

United Arab Emirates-based natural gas company, Dana Gas, has decided to use AGR software for deep water exploration in Egypt. AGR said on Wednesday that the company’s software team signed a software as a service contract with Dana Gas PJSC to supply the latest version of its P1 software. According

about 9 years ago
CCOM/JHC Sends C-Worker 4 to Survey Eastern Pacific
Equipment

CCOM/JHC Sends C-Worker 4 to Survey Eastern Pacific

Researchers from the Center for Coastal and Ocean Mapping Joint Hydrographic Center in New Hampshire have utilised a C-Worker 4 Autonomous Vessel equipped with a multibeam sonar to map around the NOAA Channel Islands National Marine Sanctuary. The Center is working in partnership with the Ocean Expl

about 9 years ago
Suretank helifuel tanks for two rigs in Gulf of Thailand
Equipment

Suretank helifuel tanks for two rigs in Gulf of Thailand

Suretank, a provider of engineered solutions to the offshore o&g industry, has manufactured and delivered specialized helifuel re-fuelling tanks and jettison skids for two rigs operating in the Gulf of Thailand. Suretank said on Tuesday that the equipment was manufactured for offshore driller Shelf

about 9 years ago
Delek to receive $980M from Tamar, Dalit sale
Equipment

Delek to receive $980M from Tamar, Dalit sale

Israel’s energy firm Delek has informed it has fulfilled all conditions for the sale of its 9.25% interests in the Tamar and Dalit fields, located in the Mediterranean Sea, offshore Israel. The company recently said it would sell its stake in the fields to the newly established entity called Tamar P

about 9 years ago
Prysmian Taps Canyon Offshore for North Sea Link Trenching
Equipment

Prysmian Taps Canyon Offshore for North Sea Link Trenching

Aberdeen-based Canyon Offshore has been awarded a contract for the provision of offshore cable trenching services on the North Sea Link Interconnector. The 1.400MW subsea HVDC system with cables linking the UK and Norway when complete will be the world’s longest submarine interconnector. The multi-m

about 9 years ago
McKay to Build NZ Landing Station for Hawaiki Subsea Cable System
Equipment

McKay to Build NZ Landing Station for Hawaiki Subsea Cable System

McKay has signed a contract with Hawaiki Submarine Cable, the owner and developer of the Hawaiki submarine cable system, for the build of the cable landing station (CLS) in Mangawhai Heads. Under the multi-million dollar contract, McKay will design and construct the Hawaiki cable landing station. Th

about 9 years ago
Kongsberg K-MATE Autonomy Controller for New USV-AUV Platform
Equipment

Kongsberg K-MATE Autonomy Controller for New USV-AUV Platform

Kongsberg Maritime has received the first order for K-MATE, its latest marine robotics innovation. K-MATE, an autonomous surface vehicle control system, will be integrated with SEA-KIT, a new class of Maritime Autonomous Surface Vessel being built by UK manufacturer, Hushcraft. SEA-KIT is an USV tha

about 9 years ago
IMCA and DMAC to Hold Diving Seminar/Workshop in September
Equipment

IMCA and DMAC to Hold Diving Seminar/Workshop in September

The International Marine Contractors Association (IMCA) and the Diving Medical Advisory Committee (DMAC) are staging a two-day IMCA Diving Seminar and DMAC Workshop in London on September 25-26, 2017 that should present a number of topics of interest to the global offshore diving community. The even

about 9 years ago
MasterFlow 9800 Grout for Beatrice OWF
Equipment

MasterFlow 9800 Grout for Beatrice OWF

Seaway Heavy Lifting has selected BASF, as part of the grouting subcontract with FoundOcean, for the supply of MasterFlow 9800 to the Beatrice offshore wind farm project. The grout will be installed by BASF’s licensed contractor FoundOcean. MasterFlow 9800 grout was mainly chosen for the grouting of

about 9 years ago
Rovco to Inspect Wave Hub Subsea Cable System
Equipment

Rovco to Inspect Wave Hub Subsea Cable System

UK-based company Rovco will carry out subsea cable system survey of the offshore renewable energy test site Wave Hub. The purpose of the project, scheduled to start July 25, is to inspect the Wave Hub subsea cable system with multibeam echo-sounder bathymetry and ROV visual survey. The survey works

about 9 years ago
  • 1
  • …
  • 568
  • 569
  • 570
  • …
  • 1895