
Bourbon Subsea Services installed a floating electrical hub (FEH) at the EolMed pilot floating wind farm site in France in Autumn 2023, the company revealed on January 9. The FEH will be connected to the project’s three floating wind turbines on one side and to the export cable on the other to enabl

Kraken Robotics has completed a cable burial survey on behalf of Asso.subsea along the 16-kilometer export cable that runs from the Gode Wind 3 offshore substation to the Dolwin Kappa platform. The operation was conducted from the MSV Astrea, employing the advanced Sub-Bottom Imager™ (SBI). Kraken R