
The Georgia Ports Authority (GPA) has ordered 28 Konecranes eco-efficient container cranes for the Port of Savannah in the U.S.

Two years after the first steel was cut, the giant main support frame (MSF) module for the Johan Sverdrup P2 platform left Aibel’s yard in Thailand.

The flare for the Energean Power floating production, storage, and offloading (FPSO) vessel has been lifted into place at Sembcorp Marine’s Admiralty Yard in Singapore.

Allseas has equipped its Pioneering Spirit vessel with a second lift system capable of removing and installing complete jackets in one go.

Osprey Group, a UK-based provider of specialist logistics services, has secured a contract from Orbital Marine Power to load out its newly built O2 tidal turbine.

Austrian crane specialist Palfinger Marine has been selected by Japanese FPSO supplier Modec to supply two-wire luffing lattice boom cranes for the floating production storage and offloading (FPSO) vessel being built for the Sangomar field in Senegal.

TechnipFMC has officially opened its brand new spoolbase in Brazil. The new facility is located in the Açu Port, north of Rio de Janeiro State. According to the company, it will be its most modern spoolbase worldwide as well as an important asset to meet the future demands of subsea projects. With a

Jumbo has completed the transportation of components for 40 foundations for the Yunlin offshore wind farm in Taiwan. For the transportation part of its Transport & Installation contract signed in 2019 with Yunneng Windpower Co. (a Taiwanese subsidiary of the German developer wpd), Jumbo mobilised sh

Granada Material Handling has secured a contract with Iv Offshore & Energy (Iv-ONE) to provide davit cranes for the HVDC offshore converter station at the Sofia offshore wind farm. The Manchester-based company will design, manufacture, third party certify and commission two individual davit crane un

Royal IHC has been modifying McDermott’s pipelay and construction vessel Amazon in the port of Rotterdam for several months. On behalf of Royal IHC, Heerema’s Sleipnir has now successfully installed the J-lay Tower onto McDermott’s vessel. IHC manages the whole modification of this project, from the

Coastal Contracts and its partner JUB Pacific are entering the liftboat business with plans to pursue expansion in the oil and gas as well as venturing into the offshore wind market.

BP’s Argos platform, built for the Mad Dog 2 project in the Gulf of Mexico, has been loaded onto a Boskalis vessel for transport to the U.S.

Oceanteam has extended storage contract for over 100 kilometres of subsea cable with one of Europe’s biggest cable manufacturers. The 6-months extension follows a three years of storage of client’s subsea cables in Oceanteam’s 5300Te carousel at its cable storage facility in Velsen, the Netherlands.

Palfinger has secured a contract to deliver 114 cranes for the transition pieces at the Seagreen offshore wind project in Scotland. Palfinger will supply its PF20000-7 LDB fixed boom cranes which have a lifting capacity of 990 kg and a minimum hoisting height of 35 m. The company’s long-term dealer