
Nine gas transmission system operators (TSOs) from the Baltic Sea region agreed to facilitate the region’s hydrogen transmission and storage infrastructure.

Bayernets is investing €210 million in the energy infrastructure in Germany, specifically a pipeline expected to meet the basic requirements for the transportation of hydrogen.