
Gould Heavy Lift Services and DEME Offshore have performed the load-in, assembly, and preparations for the load out of the new offshore drill equipment for the Saint-Nazaire offshore wind project. For DEME, the Dutch company provided the engineering, project management, rigging and turnkey execution

NKT’s new cable barge NKT Agrippina has been loaded with a cable section for the offshore wind connection project Ostwind 2 in the German part of the Baltic Sea and will soon set out on its maiden trip after being christened on 20 April. The vessel has been specially designed to transport offshore p